DESIGN OF DOMESTIC WASTEWATER SEWERAGE SYSTEM IN PALEMBANG CITY SEWERAGE PROJECT ZONE 3 IN ILIR TIMUR 1 AND ILIR TIMUR 3, PALEMBANG CITY
Palembang City Sewerage Project is a city-scale SPALD-T Development activity in Palembang City which is implemented with multiple funding sources, consisting of Australian Government Grants with a performance-based mechanism where the grant funds are transferred from the Special Account (Reksus)...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/82091 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Palembang City Sewerage Project is a city-scale SPALD-T Development activity in Palembang
City which is implemented with multiple funding sources, consisting of Australian Government
Grants with a performance-based mechanism where the grant funds are transferred from the
Special Account (Reksus) to RKUD as a reimbursement of the use of the Palembang City
APBD, APBN, as well as the APBD of South Sumatra Province and Palembang City. This
project is a collaborative effort of the Australian Government and the Indonesian Government
to improve the sanitation of Palembang City. Given the high groundwater level in Palembang
city, local wastewater treatment system is not suitable. Sei Selayur Wastewater Treatment Plant
(WWTP) is a WWTP resulting from cooperation between Indonesia and Australia which was
inaugurated in 2023. This WWTP is located in Sei Selayur Sub-district, Kalidoni District,
Palembang City, with a WWTP area of 5.9 Ha. The current location of the WWTP was chosen
because the area previously still had a large amount of vacant land, and the location is near
the edge of the Musi River so that the effluent water from the Sei Selayur WWTP can be directly
discharged into the water body, namely the Musi River. This WWTP has a processing capacity
of 20,300 m3 / day, using processing technologies such as Anaerobic Baffled Reactor (ABR),
Biological Trickling Filter (BTF), and Nitrifying Trickling Filter (NTF). However, the
construction of the piping network for the distribution of domestic wastewater itself is still in
the design stage, so that the operation of the Sei Selayur WWTP has not run optimally.
Therefore, a wastewater distribution system design was carried out in the service area to
channel domestic wastewater to the Sei Selayur WWTP. The planning of domestic wastewater
distribution in Zone 3 of the Palembang City Sewerage Project, Palembang City is carried out
in 2 stages, namely problem identification and problem solving. The identification stage
includes primary and secondary data collection, while the problem solving stage includes
evaluation, analysis, and system design. Path design is done by presenting 3 alternative paths
that will be selected through weighting using the Simple Additive Weight (SAW) method. Based
on the results of the path calculation, the wastewater generated from Zone 3 PCSP in 2024 is
12019.8 m3/day, and after population projection for the next 20 years (2044) is 18645.9
m3/day. While the service target for wastewater distribution in Zone 3 is 2650.2 m3/day. It can