SWITCHING TRANSIENTS ANALYSIS IN THE PLANNING STAGE OF THE JAVA-BALI CONNECTION (JBC) HYBRID OHL-SUBMARINE CABLE 500 KV TRANSMISSION SYSTEM
The Java-Bali Connection (JBC) project, which employs the hybrid technology of an extra-high voltage (EHV) 500 kV overhead line (OHL) and cable with XLPE insulation, is a solution for meeting the growing electricity consumption in Bali by utilizing low-cost electricity from Java. This project is...
Saved in:
Main Author: | P Nababan, Binhot |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/82190 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Analysis of switching transient overvoltages and protection techniques for the energization of the connected 115 kv underground and submarine cables
by: P. Thararak, et al.
Published: (2018) -
Analysis of switching transient overvoltages and protection techniques for the energization of the connected 115 kv underground and submarine cables
by: P. Thararak, et al.
Published: (2018) -
Analysis of switching transient overvoltages and protection techniques for the energization of the connected 115 kv underground and submarine cables
by: Thararak P., et al.
Published: (2014) -
JBC Engineering specialists' payroll system (JBC ES-PS).
by: Reyes, Alex C., et al.
Published: (2000) -
ANALYSIS OF TRANSIENT RECOVERY VOLTAGE ON SURALAYA-SURALAYA BARU 500 KV TRANSMISSION LINE DUE TO ADDITIONAL SERIES REACTORS
by: Mayla Sari, Ika