ANALYSIS OF INTEGRATED BIM IMPLEMENTATION INTHE CONTRACT CHANGE ORDER (CCOS) PROCESS(CASE STUDY: ITB INNOVATION PARK GEDEBAGE PROJECT)

Saved in:
Bibliographic Details
Main Author: Sabila Ma'wa, Rahila
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/82501
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first