FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY

Water plays a crucial role in urban development. However, in Indonesia, many cities still lack adequate access to clean water, including Cipeundeuy District, West Bandung. This is exacerbated by the clean water crisis that occurs during the long dry season. Cipeundeuy District currently relies on...

Full description

Saved in:
Bibliographic Details
Main Author: Fathinah Ramadhani, Inas
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/82591
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:82591
spelling id-itb.:825912024-07-09T09:57:57ZFEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY Fathinah Ramadhani, Inas Perencanaan wilayah Indonesia Final Project Water Supply System, Clean Water, Financial Analysis, Net Present Value, Internal Rate of Return, Payback Period, dan Benefit Cost Ratio INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/82591 Water plays a crucial role in urban development. However, in Indonesia, many cities still lack adequate access to clean water, including Cipeundeuy District, West Bandung. This is exacerbated by the clean water crisis that occurs during the long dry season. Cipeundeuy District currently relies on an individual system by utilizing groundwater as a raw water source. However, excessive groundwater use can lead to environmental damage. Therefore, alternative solutions are needed to provide sustainable clean water for the people of Cipeundeuy District. This study proposes the development of a clean water supply system (SPAM) utilizing water from Cirata Reservoir. Cirata Reservoir has great potential as a water source due to its adequate capacity. This study compares two scenarios: using Cirata Reservoir and Cibanteng Spring as water sources. The capital investment cost to build a SPAM with Cirata Reservoir as the water source is estimated at Rp 59,158,784,856, while for a SPAM with Cibanteng Spring it is Rp 119,516,897,530. Financial feasibility analysis shows that SPAM Cirata Reservoir has an NPV (Net Present Value) of Rp 84,080,618,673, an IRR (Internal Rate of Return) of 23.1484%, a BCR (Benefit Cost Ratio) of 1.0781, and a payback period of 8.9 years. The results of the analysis show that the development of SPAM Cirata Reservoir is more financially feasible compared to Cibanteng Spring text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Perencanaan wilayah
spellingShingle Perencanaan wilayah
Fathinah Ramadhani, Inas
FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY
description Water plays a crucial role in urban development. However, in Indonesia, many cities still lack adequate access to clean water, including Cipeundeuy District, West Bandung. This is exacerbated by the clean water crisis that occurs during the long dry season. Cipeundeuy District currently relies on an individual system by utilizing groundwater as a raw water source. However, excessive groundwater use can lead to environmental damage. Therefore, alternative solutions are needed to provide sustainable clean water for the people of Cipeundeuy District. This study proposes the development of a clean water supply system (SPAM) utilizing water from Cirata Reservoir. Cirata Reservoir has great potential as a water source due to its adequate capacity. This study compares two scenarios: using Cirata Reservoir and Cibanteng Spring as water sources. The capital investment cost to build a SPAM with Cirata Reservoir as the water source is estimated at Rp 59,158,784,856, while for a SPAM with Cibanteng Spring it is Rp 119,516,897,530. Financial feasibility analysis shows that SPAM Cirata Reservoir has an NPV (Net Present Value) of Rp 84,080,618,673, an IRR (Internal Rate of Return) of 23.1484%, a BCR (Benefit Cost Ratio) of 1.0781, and a payback period of 8.9 years. The results of the analysis show that the development of SPAM Cirata Reservoir is more financially feasible compared to Cibanteng Spring
format Final Project
author Fathinah Ramadhani, Inas
author_facet Fathinah Ramadhani, Inas
author_sort Fathinah Ramadhani, Inas
title FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY
title_short FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY
title_full FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY
title_fullStr FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY
title_full_unstemmed FEASIBILITY ANALYSIS FOR THE DEVELOPMENT OF DRINKING WATER SERVICES IN CIPEUNDEUY DISTRICT, WEST BANDUNG REGENCY
title_sort feasibility analysis for the development of drinking water services in cipeundeuy district, west bandung regency
url https://digilib.itb.ac.id/gdl/view/82591
_version_ 1822282281457287168