TECHNO-ECONOMIC STUDY OF THE APPLICATION OF THE BOTTOM BINARY CYCLE IN A GEOTHERMAL FIELD
The increasing global energy demand every year has driven the development of renewable energy, such as geothermal energy. Indonesia is known for having 40% of the world's geothermal reserves, equivalent to 28910 MW. However, as of 2023, only 8% or 2284 MW of geothermal power plants are insta...
Saved in:
Main Author: | Rinus Pratama Putra, Aditya |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83126 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THERMODYNAMIC AND ECONOMIC ANALYSES OF TWO GENERATIONS OF KALINA CYCLE AS BOTTOMING CYCLE FOR GEOTHERMAL POWER PLANTS
by: Ardiansyah Weiman, Reza -
The Optimization of the small scale geothermal field for Combine or binary cycles in the power plant system
by: Perpustakaan UGM, i-lib
Published: (2001) -
STUDY OF UTILIZATION OF ORGANIC RANKINE CYCLE MODULE FOR BINARY CYCLE APPLICATION IN ULUBELU GEOTHERMAL POWER PLANT
by: PUTU DODY WIDIANA - NIM: 23115307, I -
STUDY OF UTILIZATION OF ORGANIC RANKINE CYCLE MODULE FOR BINARY CYCLE APPLICATION IN ULUBELU GEOTHERMAL POWER PLANT
by: Putu Dody Widiana, I -
THERMODYNAMIC STUDY OF BINARY CYCLE LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 13106109); Pembimbing : Dr. Ir. Ari Darmawan Pasek; Prof. Dr. Ir. T. A. Fauzi S., JOAN