IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY
As part of the National Medium-Term Development Plan (RPJMN) 2020-2024, one of the main infrastructure projects is the construction of the Jakarta-Bandung High-Speed Rail (KCJB). The Jakarta-Bandung High-Speed Rail (KCJB) is scheduled to start operating on October 17, 2023. This study aims to ide...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/83239 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:83239 |
---|---|
spelling |
id-itb.:832392024-08-06T08:11:27ZIDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY Fitriah Shafirah, Nisha Produksi Indonesia Final Project High-speed rail Jakarta-Bandung (KCJB), Braga Area, benefit of high-speed rail, tourism INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/83239 As part of the National Medium-Term Development Plan (RPJMN) 2020-2024, one of the main infrastructure projects is the construction of the Jakarta-Bandung High-Speed Rail (KCJB). The Jakarta-Bandung High-Speed Rail (KCJB) is scheduled to start operating on October 17, 2023. This study aims to identify the increase in the number of visits and changes in the pattern of tourist visits to the Braga area, as well as the benefits of the construction of the KCJB for the Braga area, one of the popular heritage tourist locations in Bandung City. The data collection method used is a Revealed Preference Survey which was distributed to 115 respondents offline at Halim Station and online using social media such as WhatsApp, Instagram and Line. The research method used is quantitative descriptive analysis, gap analysis and Wilcoxon test. Variables included in the questionnaire include socio-demographic characteristics and characteristics of tourism travel patterns. The results of the study show that the KCJB has had a positive impact on tourist visits to the Braga area. This can be seen from the change in the characteristics of tourist travel patterns before and after the existence of the Jakarta-Bandung High-Speed Rail (KCJB). Some of the benefits after the operation of the KCJB are that the increasing number of tourists will boost the image and popularity of the Braga area. To ensure seamless connectivity between Stasiun Tegalluar Jakarta-Bandung High-Speed Rail and the popular Braga area in Bandung, collaboration with local transportation providers is crucial to establish feeder bus or shuttle bus services. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Produksi |
spellingShingle |
Produksi Fitriah Shafirah, Nisha IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY |
description |
As part of the National Medium-Term Development Plan (RPJMN) 2020-2024, one of the main
infrastructure projects is the construction of the Jakarta-Bandung High-Speed Rail (KCJB).
The Jakarta-Bandung High-Speed Rail (KCJB) is scheduled to start operating on October 17,
2023. This study aims to identify the increase in the number of visits and changes in the pattern
of tourist visits to the Braga area, as well as the benefits of the construction of the KCJB for
the Braga area, one of the popular heritage tourist locations in Bandung City. The data
collection method used is a Revealed Preference Survey which was distributed to 115
respondents offline at Halim Station and online using social media such as WhatsApp,
Instagram and Line. The research method used is quantitative descriptive analysis, gap
analysis and Wilcoxon test. Variables included in the questionnaire include socio-demographic
characteristics and characteristics of tourism travel patterns. The results of the study show that
the KCJB has had a positive impact on tourist visits to the Braga area. This can be seen from
the change in the characteristics of tourist travel patterns before and after the existence of the
Jakarta-Bandung High-Speed Rail (KCJB). Some of the benefits after the operation of the
KCJB are that the increasing number of tourists will boost the image and popularity of the
Braga area. To ensure seamless connectivity between Stasiun Tegalluar Jakarta-Bandung
High-Speed Rail and the popular Braga area in Bandung, collaboration with local
transportation providers is crucial to establish feeder bus or shuttle bus services. |
format |
Final Project |
author |
Fitriah Shafirah, Nisha |
author_facet |
Fitriah Shafirah, Nisha |
author_sort |
Fitriah Shafirah, Nisha |
title |
IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY |
title_short |
IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY |
title_full |
IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY |
title_fullStr |
IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY |
title_full_unstemmed |
IDENTIFICATION THE IMPACT OF JAKARTA-BANDUNG HIGHSPEED RAIL (KCJB) ON TOURIST VISITS TO THE BRAGA AREA IN BANDUNG CITY |
title_sort |
identification the impact of jakarta-bandung highspeed rail (kcjb) on tourist visits to the braga area in bandung city |
url |
https://digilib.itb.ac.id/gdl/view/83239 |
_version_ |
1822998041510019072 |