DESIGN OF STEPPED CHUTE SPILLWAY FOR THE MENINTING DAM IN WEST LOMBOK REGENCY, WEST NUSA TENGGARA BARAT
The Meninting Dam, covering a watershed area of 32.77 km2, is currently under construction in West Nusa Tenggara to address water-related challenges on the island of Lombok. The dam serves the purpose of supplying raw water to the network system, irrigation systems, and a small hydropower plant (PLT...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83396 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |