OPTIMIZATION OF LIQUEFIED PETROLEUM GAS TERMINAL CONFIGURATION OF PT X IN SOUTH KALIMANTAN USING MIXED INTEGER LINEAR PROGRAMMING
The current LP-Gas supply chain network of PT X in South Kalimantan is inefficient. Due to the height limitations of Barito Bridge, only Lighter types of ship could supply LP-Gas Terminal Y. Several main roads and bridges also became impassable due to flood disasters which contributes to high di...
Saved in:
Main Author: | Andrew |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83906 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
The liquefied petroleum gas industry
by: Marty, Conrado Garcia
Published: (1975) -
Automatic liquefied petroleum gas shut-off valve.
by: Acyatan, Carlo Paolo S., et al.
Published: (2009) -
Mixed integer linear programming model for workload leveling on offshore platform of Petroleum Company
by: Malinee Wongruean
Published: (2012) -
Econometric analyses of liquefied petroleum gas and product tanker shipping markets
by: Bai, Xiwen
Published: (2019) -
CFD SIMULATION OF LIQUEFIED PETROLEUM GAS (LPG) COMBUSTION IN A HOUSEHOLD GAS STOVE
by: Elga Akbar Maulana, Mochamad