FEASIBILITY STUDY OF CEMENT PLANT PRODUCTION FACILITY UPGRADE TO SUPPORT EXPORT BUSINESS CASE STUDY AT PT PEMBANGUNAN INDONESIA
Competition on the Indonesian cement market has been more aggressive as new cement companies have been emerging since 2013 and currently the market can be categorized as an excess of supply. Domestic cement industry's plant utilization dropped to between 50 - 60 percent accordingly. To ad...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84048 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Competition on the Indonesian cement market has been more aggressive as new
cement companies have been emerging since 2013 and currently the market can
be categorized as an excess of supply. Domestic cement industry's plant utilization
dropped to between 50 - 60 percent accordingly. To address domestic market's
oversupply situation, this project feasibility study examines the potential upgrade
of PT Pembangunan Indonesia's facility to facilitate the export cement to the
United States of America. In this research, business background is
comprehensively assessed by the PESTEL, Five Porter, and SWOT analysis
framework. The quantitative research methodology is applied using capital
budgeting technique, sensitivity and Monte Carlo analysis. The project includes
significant investment and operational expenditures, such as the extension of the
jetty and the construction of new production facilities. In summary, the project is
economically feasible and potentially can improve PT PI's financial performance
in the future. The study result shows positive NPV 898 Bio IDR, higher IRR
16.16%, acceptable discounted Payback Period 13.2 years, good Profitability
Index 1.64. According to Sensitivity analysis, cement price is become dominant
factor which impact to project profitability. The same conclusion also coming
from Monte Carlo analysis through 10.000 time random generation of input
variable, this project has positive NPV probability 86.15%, and the probability of
IRR more than WACC is 87.93%. |
---|