#TITLE_ALTERNATIVE#

Abstract: <br /> <br /> <br /> <br /> <br /> Boyong river is one of rivers in which the upstream refers ti Merapi volcano. The Boyong river flows down and split Yogyakarta municipality. So, it is understood that Yogyakarta is sensitive to volcano eruption disaster....

Full description

Saved in:
Bibliographic Details
Main Author: Murod (NIM : 950 00 021), Khoirul
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/8408
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:8408
spelling id-itb.:84082017-09-27T15:23:31Z#TITLE_ALTERNATIVE# Murod (NIM : 950 00 021), Khoirul Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/8408 Abstract: <br /> <br /> <br /> <br /> <br /> Boyong river is one of rivers in which the upstream refers ti Merapi volcano. The Boyong river flows down and split Yogyakarta municipality. So, it is understood that Yogyakarta is sensitive to volcano eruption disaster. The eruption effects may be direct such as hot cloud and indirect effect such as flow of lahar or debris. <br /> <br /> <br /> <br /> <br /> To protect Yogyakarta municipality from the above volcano eruption disasater, it has been developed sabo technology which constructs check dam in Boyong river. There are 7 exiyfmg check dams up to present. There is Boyong Dam number 7 (BO D7 ) as open check dam type and Boyong Dam number 6 (BO D6) is the next as closed check dam type. <br /> <br /> <br /> <br /> <br /> The function of check dam is to control sediment, in which temporarily catches the sediment when flood comes and releases the sediment when small discharge takes place. This condition makes possibility to catch the next sediment lahar or debris carried by the next flood. <br /> <br /> <br /> <br /> <br /> When lahar or debris flood occur in 1995. BO D6 was able to control sediment 28.65%. The time needed to reopen new space was 3 days. Whereas the occurance in 2000, sediment can be controlled was equal to 28.98%. The time needed to reopen new space was 31 days. <br /> <br /> <br /> <br /> <br /> On other hand, in January 18, 1998 when lahar or debris flood taken place BO D7 was able to control sediment was equal 9.1%, and needed 17 days of flushing. The BO D7 was able to control sediment equal to 12.35% on February 16, 1998. The time to flush sediment was 3 days. On 24 February the amount of sediment to be controlled reached 9.42%, and needed 45 days of flushing. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract: <br /> <br /> <br /> <br /> <br /> Boyong river is one of rivers in which the upstream refers ti Merapi volcano. The Boyong river flows down and split Yogyakarta municipality. So, it is understood that Yogyakarta is sensitive to volcano eruption disaster. The eruption effects may be direct such as hot cloud and indirect effect such as flow of lahar or debris. <br /> <br /> <br /> <br /> <br /> To protect Yogyakarta municipality from the above volcano eruption disasater, it has been developed sabo technology which constructs check dam in Boyong river. There are 7 exiyfmg check dams up to present. There is Boyong Dam number 7 (BO D7 ) as open check dam type and Boyong Dam number 6 (BO D6) is the next as closed check dam type. <br /> <br /> <br /> <br /> <br /> The function of check dam is to control sediment, in which temporarily catches the sediment when flood comes and releases the sediment when small discharge takes place. This condition makes possibility to catch the next sediment lahar or debris carried by the next flood. <br /> <br /> <br /> <br /> <br /> When lahar or debris flood occur in 1995. BO D6 was able to control sediment 28.65%. The time needed to reopen new space was 3 days. Whereas the occurance in 2000, sediment can be controlled was equal to 28.98%. The time needed to reopen new space was 31 days. <br /> <br /> <br /> <br /> <br /> On other hand, in January 18, 1998 when lahar or debris flood taken place BO D7 was able to control sediment was equal 9.1%, and needed 17 days of flushing. The BO D7 was able to control sediment equal to 12.35% on February 16, 1998. The time to flush sediment was 3 days. On 24 February the amount of sediment to be controlled reached 9.42%, and needed 45 days of flushing.
format Theses
author Murod (NIM : 950 00 021), Khoirul
spellingShingle Murod (NIM : 950 00 021), Khoirul
#TITLE_ALTERNATIVE#
author_facet Murod (NIM : 950 00 021), Khoirul
author_sort Murod (NIM : 950 00 021), Khoirul
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/8408
_version_ 1820664405559345152