DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA

Saved in:
Bibliographic Details
Main Author: Arfiansyah, Oky
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84256
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:84256
spelling id-itb.:842562024-08-14T15:46:12ZDEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA Arfiansyah, Oky Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84256 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Theses
author Arfiansyah, Oky
spellingShingle Arfiansyah, Oky
DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA
author_facet Arfiansyah, Oky
author_sort Arfiansyah, Oky
title DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA
title_short DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA
title_full DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA
title_fullStr DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA
title_full_unstemmed DEVELOPMENT OF LOCOMOTIVE CC 203 MAINTENANCE STRATEGY USING RISK-BASED RELIABILITY CENTERED MAINTENANCE (RCM 3) METHOD AT PT KERETA API INDONESIA
title_sort development of locomotive cc 203 maintenance strategy using risk-based reliability centered maintenance (rcm 3) method at pt kereta api indonesia
url https://digilib.itb.ac.id/gdl/view/84256
_version_ 1822010319892905984