STAKEHOLDERS COLLABORATION IN THE IMPLEMENTATION OF THE PROGRAM FOR THE ACCELERATION OF IMPROVEMENT OF IRRIGATION WATER USE (P3-TGAI) (CASE STUDY AT CIANJUR REGENCY)
Irrigation is a basic need in agriculture and also one of the infrastructure facilities that support the implementation of economic development in the agricultural sector and national food security. The Program for the Acceleration of Improvement of Irrigation Water Use (P3-TGAI) is a program of reh...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84476 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Irrigation is a basic need in agriculture and also one of the infrastructure facilities that support the implementation of economic development in the agricultural sector and national food security. The Program for the Acceleration of Improvement of Irrigation Water Use (P3-TGAI) is a program of rehabilitation, improvement or construction of irrigation networks based on the participation of farmer communities which is carried out by the Association of Water User Farmers (P3A/GP3A/IP3A), in a self-managed manner and implemented in a cash for work programs. Starting from the lack of research that explains collaboration in the implementation of cash for work programs, researchers are interested in discussing further the collaboration of stakeholders in The Program for the Acceleration of Improvement of Irrigation Water Use Program in Cianjur Regency.
This research uses a qualitative descriptive analysis method with data collection techniques through observation, semi-structured interviews, and literature studies which are then processed using stakeholder analysis to identify and map the actors involved directly and indirectly and the communication process between stakeholders.
The actors involved in The Program for the Acceleration of Improvement of Irrigation Water Use in Cianjur Regency involve state and non-state actors where some are directly and indirectly involved. In the communication process between actors, several obstacles were found but these obstacles can still be overcome. Based on the results of this study, it can be concluded that the implementation of P3-TGAI in Cianjur Regency shows the existence of a collaboration model between stakeholders because there is an authentic dialog between stakeholders starting from the stakeholder level at the central, provincial, district levels to the beneficiary community.
|
---|