THE IMPACT OF DIAPHRAGM WALL PENETRATION DEPTH ON EXCAVATION STABILITY FOR THE MRT STATION PROJECT

The Sawah Besar MRT Station project is a a deep excavation project located in central Jakarta. The construction of this station is being carried out along Jalan Gadjah Mada, an area surrounded by tall buildings and the Ciliwung River. The project’s limited workspace present challenges, requiring the...

Full description

Saved in:
Bibliographic Details
Main Author: Aji Abdilla, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84602
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia