THE IMPACT OF DIAPHRAGM WALL PENETRATION DEPTH ON EXCAVATION STABILITY FOR THE MRT STATION PROJECT
The Sawah Besar MRT Station project is a a deep excavation project located in central Jakarta. The construction of this station is being carried out along Jalan Gadjah Mada, an area surrounded by tall buildings and the Ciliwung River. The project’s limited workspace present challenges, requiring the...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84602 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |