PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)

The COVID-19 pandemic, which began in 2020, has significantly disrupted global education systems, including those in Indonesia. The sudden shift from traditional face-to-face learning to online-based systems has posed substantial challenges, especially in underdeveloped and remote regions (3T areas)...

Full description

Saved in:
Bibliographic Details
Main Author: Qudrati Akmal, Shira
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/84686
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:84686
spelling id-itb.:846862024-08-16T14:33:22ZPROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB) Qudrati Akmal, Shira Manajemen umum Indonesia Theses Project Delay, Project Management Book of Knowledge, Root Cause Analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84686 The COVID-19 pandemic, which began in 2020, has significantly disrupted global education systems, including those in Indonesia. The sudden shift from traditional face-to-face learning to online-based systems has posed substantial challenges, especially in underdeveloped and remote regions (3T areas) that lack the necessary technological infrastructure. This study focuses on the PT EIU Project for the implementation of an online education system in Indonesia, specifically through the distribution of Tablet PCs to facilitate distance learning in 3T areas. This study aims to identify the root causes of delays and inefficiencies in the project timeline and to propose solutions for improving project management practices. The author used the PMBOK (Project Management Book of Knowledge) sixth edition method and Root Cause Analysis (RCA) to find the root cause of the project delay. The Challenge of the Company is to procure the education Tablet PC product for DIKTIEDU such as under COVID-19 conditions with lack of implementation of Time, Cost, and Risk Management causes late time delivery to the end users. In this study, the author finds there is a difference between the planned project timeline and the actual. The proposed business solution involves incorporating a comprehensive suite of tools and techniques for data analysis to achieve more precise and reliable estimates of activity durations. By implementing Process Management, the company can enhance its ability to predict project timelines accurately. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Qudrati Akmal, Shira
PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)
description The COVID-19 pandemic, which began in 2020, has significantly disrupted global education systems, including those in Indonesia. The sudden shift from traditional face-to-face learning to online-based systems has posed substantial challenges, especially in underdeveloped and remote regions (3T areas) that lack the necessary technological infrastructure. This study focuses on the PT EIU Project for the implementation of an online education system in Indonesia, specifically through the distribution of Tablet PCs to facilitate distance learning in 3T areas. This study aims to identify the root causes of delays and inefficiencies in the project timeline and to propose solutions for improving project management practices. The author used the PMBOK (Project Management Book of Knowledge) sixth edition method and Root Cause Analysis (RCA) to find the root cause of the project delay. The Challenge of the Company is to procure the education Tablet PC product for DIKTIEDU such as under COVID-19 conditions with lack of implementation of Time, Cost, and Risk Management causes late time delivery to the end users. In this study, the author finds there is a difference between the planned project timeline and the actual. The proposed business solution involves incorporating a comprehensive suite of tools and techniques for data analysis to achieve more precise and reliable estimates of activity durations. By implementing Process Management, the company can enhance its ability to predict project timelines accurately.
format Theses
author Qudrati Akmal, Shira
author_facet Qudrati Akmal, Shira
author_sort Qudrati Akmal, Shira
title PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)
title_short PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)
title_full PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)
title_fullStr PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)
title_full_unstemmed PROJECT DELAY ANALYSIS IN PT. ELEKTRONIKA INFORMATIKA UTAMA ITB (PT. EIU-ITB)
title_sort project delay analysis in pt. elektronika informatika utama itb (pt. eiu-itb)
url https://digilib.itb.ac.id/gdl/view/84686
_version_ 1822010457967296512