DESIGN PLANNING OF WATER TREATMENT PLANT (WTP) II IN THE SUMMARECON BANDUNG AREA
Summarecon Bandung, as the first integrated city development in Bandung City, faces challenges in providing clean water independently due to the absence of a water distribution network from PDAM Bandung in the Gedebage District. To reduce reliance on groundwater, Summarecon Bandung plans the const...
Saved in:
Main Author: | Afiyanti Putri, Regia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84713 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN PLANNING OF WATER TREATMENT PLANT (WTP) II IN THE SUMMARECON BANDUNG AREA
by: Afiyanti Putri, Regia -
DESIGN OF CIKALONG WATER TREATMENT PLANT ( WTP ) BANDUNG
by: Nurul Fitri, Adelya -
DESIGN OF WATER TREATMENT PLANT (WTP) KERTASARI BANDUNG REGENCY
by: Saffanah Na'Ima Triani, Sekar -
DESIGN OF FILTRATION, DISINFECTION, AND RESERVOIR UNIT AT SADU WATER TREATMENT PLANT (WTP) STAGE II, BANDUNG DISTRICT
by: Luvita, Firani -
THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
by: Eka Saputri, Ramandini