DESIGN PLANNING OF WATER TREATMENT PLANT (WTP) II IN THE SUMMARECON BANDUNG AREA
Summarecon Bandung, as the first integrated city development in Bandung City, faces challenges in providing clean water independently due to the absence of a water distribution network from PDAM Bandung in the Gedebage District. To reduce reliance on groundwater, Summarecon Bandung plans the const...
Saved in:
主要作者: | Afiyanti Putri, Regia |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/84729 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
DESIGN PLANNING OF WATER TREATMENT PLANT (WTP) II IN THE SUMMARECON BANDUNG AREA
由: Afiyanti Putri, Regia -
DESIGN OF CIKALONG WATER TREATMENT PLANT ( WTP ) BANDUNG
由: Nurul Fitri, Adelya -
DESIGN OF WATER TREATMENT PLANT (WTP) KERTASARI BANDUNG REGENCY
由: Saffanah Na'Ima Triani, Sekar -
DESIGN OF FILTRATION, DISINFECTION, AND RESERVOIR UNIT AT SADU WATER TREATMENT PLANT (WTP) STAGE II, BANDUNG DISTRICT
由: Luvita, Firani -
THE DEVELOPMENT OF WATER TREATMENT PLANT (WTP) I AND II OF PDAM WAY RILAU BANDAR LAMPUNG CITY BY NEW WTP CONSTRUCTION PLANNING
由: Eka Saputri, Ramandini