LEAN-SIX SIGMA APPROACH TO MINIMIZE WAITING TIME IN COAL DELIVERY PROCESS TO CUSTOMERS: A CASE STUDY OF PT XYZ

This research aims to identify and reduce waiting time in the coal delivery process at PT XYZ using the Lean Six Sigma approach. The analysis found that the lead time for each mother vessel is 131.5 hours, with 105.5 hours (80.3%) consisting of value-added activities. The remaining time consists of...

Full description

Saved in:
Bibliographic Details
Main Author: Yudanto, Landung
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85386
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items