OPTIMIZATION OF BAUXITE ORE MINING USING MIXED INTEGER LINEAR PROGRAMMING TO MAXIMIZE NET PRESENT VALUE: A CASE STUDY OF PT KALIMANTAN BERKAH INTI TAMBANG (HARITA BAUXITE)
Mining activities only consider technical factors, namely from the grade parameters sent, without considering long-term economic factors. This approach implies that high operating cost and capital expenditure can lead to lower profits, even though the Al2O3 grade in the MGB (Metallurgical Grade Baux...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85397 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |