GROUNDWATER MODELING USING FINITE ELEMENT METHOD TO ESTIMATE PASSIVE INFLOW IN KUCING LIAR MINE PT. FREEPORT INDONESIA
Kucing Liar is the future mine of PT Freeport Indonesia, which will start production in 2028 using the block caving mining method. It is located in the central mountains of Papua, which have high rainfall and complex geological structures. This condition results in a significant influence of passive...
Saved in:
Main Author: | Hadi Ramadhan, Taufiq |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85450 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
AEROFRACTURE ANALYSIS ON UNIDIRECTIONAL COMPOSITE PLATE BY MEANS OF FINITE ELEMENT METHOD AND DOUBLET LATTICE METHOD
by: Akmal Ramadhan, Faisal -
MODEL SIMULATION OF GROUNDWATER FLOW PATTERN IN INFRASTRUCTURE DEVELOPMENT AT PT. XYZ METAL MINE USING MODFLOW
by: Sianturi, Hartoyo -
EVALUATION AND TREATMENT OF NOISE IN LIGHT RAILWAY TRANSIT FLOOR BASED ON WAVEGUIDE FINITE ELEMENT - BOUNDARY ELEMENT METHOD
by: Khairin Nisa, Ainil -
EVALUATION AND TREATMENT OF NOISE IN LIGHT RAILWAY TRANSIT FLOOR BASED ON WAVEGUIDE FINITE ELEMENT - BOUNDARY ELEMENT METHOD
by: Muhammad Rahayu, Genta -
DESIGN AND ANALYSIS OF PIPELINE POST TRENCHING USING FINITE ELEMENT METHOD
by: Puteri Santosa, Lita