EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE

In 2018, a mining company in Indonesia that in collaboration with SRK Consulting Inc., developed a localized numerical model of groundwater flow aimed at predicting the ingress of groundwater into the Block Cave mine. This model successfully forecasted a considerable rise in water flow emanating fro...

Full description

Saved in:
Bibliographic Details
Main Author: Adi Lukito, Herdy
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85523
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:85523
spelling id-itb.:855232024-08-21T13:13:53ZEVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE Adi Lukito, Herdy Indonesia Theses Local numerical groundwater flow model, passive inflow, drainage, preemptive.. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/85523 In 2018, a mining company in Indonesia that in collaboration with SRK Consulting Inc., developed a localized numerical model of groundwater flow aimed at predicting the ingress of groundwater into the Block Cave mine. This model successfully forecasted a considerable rise in water flow emanating from the drawpoints at the extraction level, which reached its zenith at 3,111 gallons per minute (gpm) in April 2021. Subsequent drainage activities effectively mitigated the passive inflow at the extraction level from April to September 2021, reducing it to approximately 2,000 gpm. It is noteworthy that the predicted water flow in the base case scenario was lower than the actual observed flow, primarily because the model did not incorporate prospective drainage operations. Nevertheless, it is imperative to manage the anticipated surge in water flow through preemptive drainage measures to avert potential disruptions to future mining operations. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In 2018, a mining company in Indonesia that in collaboration with SRK Consulting Inc., developed a localized numerical model of groundwater flow aimed at predicting the ingress of groundwater into the Block Cave mine. This model successfully forecasted a considerable rise in water flow emanating from the drawpoints at the extraction level, which reached its zenith at 3,111 gallons per minute (gpm) in April 2021. Subsequent drainage activities effectively mitigated the passive inflow at the extraction level from April to September 2021, reducing it to approximately 2,000 gpm. It is noteworthy that the predicted water flow in the base case scenario was lower than the actual observed flow, primarily because the model did not incorporate prospective drainage operations. Nevertheless, it is imperative to manage the anticipated surge in water flow through preemptive drainage measures to avert potential disruptions to future mining operations.
format Theses
author Adi Lukito, Herdy
spellingShingle Adi Lukito, Herdy
EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE
author_facet Adi Lukito, Herdy
author_sort Adi Lukito, Herdy
title EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE
title_short EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE
title_full EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE
title_fullStr EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE
title_full_unstemmed EVALUATION OF ACTUAL GROUNDWATER FLOW AMOUNT AGAINST GROUNDWATER FLOW SCENARIO YEAR 2018 AT XXX BLOCK CAVE MINE
title_sort evaluation of actual groundwater flow amount against groundwater flow scenario year 2018 at xxx block cave mine
url https://digilib.itb.ac.id/gdl/view/85523
_version_ 1822999200347979776