PROJECT SCHEDULING ANALYSIS IN THE OIL AND GAS INDUSTRY WITH CRITICAL PATH METHOD
Saved in:
Main Author: | Risang Dewo Katon, Antonius |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85583 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
An investigation of critical chain and lean project scheduling
by: Shen, L., et al.
Published: (2014) -
Path-constrained relaxed schedulability analysis
by: Andrei, Ş., et al.
Published: (2013) -
Critical-path based low-energy scheduling algorithms for body area network systems
by: Liu, Y., et al.
Published: (2014) -
Management of complexity in Norwegian oil & gas projects : an industrial case study
by: Deepack, Subbiah
Published: (2013) -
THE APPLICATION OF AS-BUILT BUT-FOR SCHEDULE ANALYSIS METHOD FOR CONSTRUCTION PROJECTS
by: Ramadhani, Sofyan