ANALISIS KOMPREHENSIF TENTANG PEMECAHAN MASALAH YANG MEMPENGARUHI MASA PAKAI DAN OPTIMALISASI POMPA SUBMERSIBLE ELEKTRIK (ESP) DI LAPANGAN X

This study presents an analysis of the relationship between Chan’s plot parameters, specifically Water Oil Ratio (WOR) and Water Oil Ratio Derivative (WOR’), and the Bond Index in the cementing process at Field X. The study aims to establish both quantitative and qualitative correlations between...

Full description

Saved in:
Bibliographic Details
Main Author: Nurul Putri Aqilah, Iftitah
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/85765
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:This study presents an analysis of the relationship between Chan’s plot parameters, specifically Water Oil Ratio (WOR) and Water Oil Ratio Derivative (WOR’), and the Bond Index in the cementing process at Field X. The study aims to establish both quantitative and qualitative correlations between these parameters to predict the water cut that may occur following remedial cementing operations. Through comprehensive data analysis and plotting, the study identifies significant correlations, offering valuable insights for improving predictive accuracy and decision-making in cementing processes. The findings provide a result for better understanding the impact of Chan’s plot parameters on the Bond Index, thereby enhancing the efficiency of cementing process in similar field operations.