STUDY ON THE EFFECTIVENESS OF MUNICIPAL SOLID WASTE (MSW) PROCESSING IN THE REFUSE DERIVED FUEL (RDF) PRODUCTION PROCESS (CASE STUDY: RDF PLANT JERUKLEGI)
Refuse-Derived Fuel (RDF) Plant Jeruklegi has become a facility at TPA Tritih Lor, utilizing waste-to-energy (WtE) technology to convert waste into alternative fuel. TPA Tritih Lor is the largest landfill service area and capacity in Cilacap Regency. Consequently, an effectiveness study is necess...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/86226 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Refuse-Derived Fuel (RDF) Plant Jeruklegi has become a facility at TPA Tritih Lor,
utilizing waste-to-energy (WtE) technology to convert waste into alternative fuel.
TPA Tritih Lor is the largest landfill service area and capacity in Cilacap Regency.
Consequently, an effectiveness study is necessary to optimize RDF Plant Jeruklegi.
Based on sampling, the most prevalent composition is organic waste, accounting
for 43%. The density of the incoming waste is 301.49 kg/m³. The RDF production
process involves mechanical biological treatment (MBT), including weighing,
sorting by scavengers, shredding, drying, and separation using a screening
machine. The drying process is conducted in a drying bay equipped with semipermeable membranes and an aeration unit to support microbial degradation. The
RDF Plant can produce RDF with a moisture content of 12.264%, ash content of
8.483%, volatile content of 75.831%, fixed carbon content of 3.422%, particle size
less than 5 cm, calorific value of 4634.116 kcal/kg, mass reduction of 67.67%, and
volume reduction of 72.57%. The sorting process by scavengers has the potential
to reduce the calorific value of the waste by up to 3.49%. The use of RDF Plant can
extend the landfill's lifespan by 8 years and 10 months and prevent 18,354.36 tons
of CO?eq per year. The RDF Plant still requires operational costs of IDR226,442
per ton of waste and investment is crucial for its feasibility. The drying process
requires 44 days to optimize the quality of the produced RDF. |
---|