ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY

Flooding is a natural phenomenon that has a significant impact on urban areas and communities. One area that frequently experiences flooding is the Cinambo River Basin, particularly in the Pasar Gedebage area of Bandung City. This study aims to propose solutions to reduce flood water surface elev...

Full description

Saved in:
Bibliographic Details
Main Author: Huwaida Hasari, Sarah
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/86322
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:86322
spelling id-itb.:863222024-09-17T14:48:26ZANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY Huwaida Hasari, Sarah Teknik sipil Indonesia Final Project flood, HEC-HMS, HEC-RAS, normalization, levees, retention pond INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/86322 Flooding is a natural phenomenon that has a significant impact on urban areas and communities. One area that frequently experiences flooding is the Cinambo River Basin, particularly in the Pasar Gedebage area of Bandung City. This study aims to propose solutions to reduce flood water surface elevation in the region. A hydrological analysis was conducted to obtain the 5-year return period design discharge using the Synthetic Unit Hydrograph (SUH) SCS method, processed through HEC-HMS. A hydraulic analysis was then performed using HEC-RAS to simulate water inundation during floods and to design flood control structures. The proposed solutions include river normalization and the construction of parapet levees along the riverbanks, with an additional alternative of a retention pond. Stability checks were conducted, and it was found that the design meets the minimum safety factor requirements. The total cost for the proposed flood control plan in the study area is Rp7,808,761,000.00. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Huwaida Hasari, Sarah
ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY
description Flooding is a natural phenomenon that has a significant impact on urban areas and communities. One area that frequently experiences flooding is the Cinambo River Basin, particularly in the Pasar Gedebage area of Bandung City. This study aims to propose solutions to reduce flood water surface elevation in the region. A hydrological analysis was conducted to obtain the 5-year return period design discharge using the Synthetic Unit Hydrograph (SUH) SCS method, processed through HEC-HMS. A hydraulic analysis was then performed using HEC-RAS to simulate water inundation during floods and to design flood control structures. The proposed solutions include river normalization and the construction of parapet levees along the riverbanks, with an additional alternative of a retention pond. Stability checks were conducted, and it was found that the design meets the minimum safety factor requirements. The total cost for the proposed flood control plan in the study area is Rp7,808,761,000.00.
format Final Project
author Huwaida Hasari, Sarah
author_facet Huwaida Hasari, Sarah
author_sort Huwaida Hasari, Sarah
title ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY
title_short ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY
title_full ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY
title_fullStr ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY
title_full_unstemmed ANALYSIS OF FLOOD WATER SURFACE ELEVATION CONTROL IN THE CINAMBO SUB-WATERSHED, GEDEBAGE MARKET AREA, BANDUNG CITY
title_sort analysis of flood water surface elevation control in the cinambo sub-watershed, gedebage market area, bandung city
url https://digilib.itb.ac.id/gdl/view/86322
_version_ 1822011016131641344