FRONT-END ENGINEERING DESIGN OF PAD 28 GEOTHERMAL BRINE INJECTION FACILITY
Saved in:
Main Author: | Vieri M Situmorang, Peregrinus |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86406 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BRINE PIPING SYSTEM DESIGN IN GEOTHERMAL POWER PLANT FACILITIES CIBUNI 10 MW NETT.
by: Victor Setiyohadi, Eunico -
DESIGN OF BRINE INJECTION PIPELINE AT ULUBELU GEOTHERMAL POWER PLANT SYSTEM CLUSTER E TO CLUSTER R1 AND R2
by: Maximilian S. Wongkar, Marvin -
DESIGNING BRINE PIPELINE FOR GEOTHERMAL POWER PLANT USING HDPE PIPE
by: Rahadyan, Ari -
TECHNICAL & FINANCIAL STUDY AND FRONT END ENGINEERING DESIGN (FEED)PRODUCTION FACILITIES FOR WELL HCE 9B DIENG AREA
by: Alvin, Leonard -
If sampling receiver front end design
by: SU ZHENJIANG
Published: (2010)