DEVELOPMENT OF A MAINTENANCE PROGRAM FOR PT INKA'S BOGIE DIESEL ELECTRIC MULTIPLE UNIT USING RELIABILITY CENTERED MAINTENANCE II
Saved in:
Main Author: | Sulistyowati, Ririn |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86484 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Productivity Increment at PT INKA Pemasangan Komponen Bogie Workshop
by: Enji, Eugene -
Reliability Centered Maintenance for electrical distribution system of Phontong substation in Vientiane Capital
by: O. Vilayphonh, et al.
Published: (2018) -
Reliability Centered Maintenance for electrical distribution system of Phontong substation in Vientiane Capital
by: O. Vilayphonh, et al.
Published: (2018) -
RELIABILITY CENTERED MAINTENANCE AS OPERATIONAL EXCELLENCE OF WORLD CLASS MAINTENANCE IN PT. CHEVRON PACIFIC INDONESIA
by: ARDIYANSYAH (NIM: 29106376); Pembimbing : Ir. Rudy Bekti, MM, TOMMY -
ANALISA PERAWATAN UNIT PEMBANGKITAN GRESIK UNIT III DENGAN METODE RELIABILITY CENTERED MAINTENANCE
by: , DIDIK WAHYUDI, et al.
Published: (2011)