ANALYSIS OF AIRCRAFT MAINTENANCE SPARE PARTS PROCUREMENT STRATEGY IN INDONESIA
Saved in:
Main Author: | Tumbur Febrian, Jeremy |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/86825 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF FAILURE RATE OF CC 206 LOCOMOTIVE COMPONENTS TO DETERMINE SPARE PARTS REQUIREMENT POLICY USING RELIABILITY CENTERED SPARES (RCS) METHOD
by: Tamitakarza, Herdi -
ANALYSIS OF THE INFLUENCE OF WING FLEXIBILITY ON THE LONGITUDINAL DYNAMICS OF AIRCRAFT
by: Hanif Budiman, Arsyi -
FLUTTER ANALYSIS FIGHTER AIRCRAFT WING WITH CONVENTIONAL STRUCTURE CONFIGURATION
by: Hayati Putri, Mardiah -
DESIGN AND ANALYSIS OF PROPELLER STRUCTURE ON LSU-03 AIRCRAFT WITH COMPOSITE MATERIAL
by: Rahmadi Nuranto, Awang -
BENDING CRUSH ANALYSIS OF LATTICE STRUCTURE CONFIGURATIONS FOR AIRCRAFT SUBFLOOR APPLICATIONS
by: Nur Azizah, Nabilah