ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA

Ungaran is one of the important subsystems in the Central Java system. This subsystem is the main supplier of consumers to the significantly growing industrial area in the north coast region, and also supplies the business center and the government offices in Semarang, the capital city of Central...

Full description

Saved in:
Bibliographic Details
Main Author: Nurzikry, Deliar
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/87110
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:87110
spelling id-itb.:871102025-01-13T11:36:24ZANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA Nurzikry, Deliar Indonesia Theses island operation, defense scheme, adaptive defense scheme, frequency stability, voltage stability, contingency analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/87110 Ungaran is one of the important subsystems in the Central Java system. This subsystem is the main supplier of consumers to the significantly growing industrial area in the north coast region, and also supplies the business center and the government offices in Semarang, the capital city of Central Java province. During its operation, potential interruption of Inter-Bus Transformer (IBT) 500kV/150kV supply or frequency drop exceeding certain limits can cause the Ungaran Subsystem to form Island Operation. On May 30, 2020, the Ungaran Subsystem experienced a total blackout due to N-2 IBT disturbance, the island failed to form. Thus, due to its importance, maintaining the integrity of island operation in the Ungaran Subsystem is of high priority. The installed defense scheme is still static so that it is not flexible enough to cope with change of the distribution load and changes in the operating pattern of the power plant so that the success percentage of this static defense scheme is small. To increase the success rate of the island operation in the contingency event of loss of supply from the 500 kV system (IBT 500/150 kV) and frequency drop to 48.3 Hz, an adaptive island operation scheme is proposed. The success of the island operation scheme in the Ungaran subsystem can save the Tambaklorok Power Plant to avoid startup costs and speed up the recovery process. Based on the performed simulations, the proposed scheme could maintain the generation load balance during island operation and results in successful island operation. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Ungaran is one of the important subsystems in the Central Java system. This subsystem is the main supplier of consumers to the significantly growing industrial area in the north coast region, and also supplies the business center and the government offices in Semarang, the capital city of Central Java province. During its operation, potential interruption of Inter-Bus Transformer (IBT) 500kV/150kV supply or frequency drop exceeding certain limits can cause the Ungaran Subsystem to form Island Operation. On May 30, 2020, the Ungaran Subsystem experienced a total blackout due to N-2 IBT disturbance, the island failed to form. Thus, due to its importance, maintaining the integrity of island operation in the Ungaran Subsystem is of high priority. The installed defense scheme is still static so that it is not flexible enough to cope with change of the distribution load and changes in the operating pattern of the power plant so that the success percentage of this static defense scheme is small. To increase the success rate of the island operation in the contingency event of loss of supply from the 500 kV system (IBT 500/150 kV) and frequency drop to 48.3 Hz, an adaptive island operation scheme is proposed. The success of the island operation scheme in the Ungaran subsystem can save the Tambaklorok Power Plant to avoid startup costs and speed up the recovery process. Based on the performed simulations, the proposed scheme could maintain the generation load balance during island operation and results in successful island operation.
format Theses
author Nurzikry, Deliar
spellingShingle Nurzikry, Deliar
ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
author_facet Nurzikry, Deliar
author_sort Nurzikry, Deliar
title ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
title_short ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
title_full ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
title_fullStr ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
title_full_unstemmed ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
title_sort analysis of adaptive island operation in ungaran subsystem central java
url https://digilib.itb.ac.id/gdl/view/87110
_version_ 1822999807945342976