ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA
Ungaran is one of the important subsystems in the Central Java system. This subsystem is the main supplier of consumers to the significantly growing industrial area in the north coast region, and also supplies the business center and the government offices in Semarang, the capital city of Central...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87110 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:87110 |
---|---|
spelling |
id-itb.:871102025-01-13T11:36:24ZANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA Nurzikry, Deliar Indonesia Theses island operation, defense scheme, adaptive defense scheme, frequency stability, voltage stability, contingency analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/87110 Ungaran is one of the important subsystems in the Central Java system. This subsystem is the main supplier of consumers to the significantly growing industrial area in the north coast region, and also supplies the business center and the government offices in Semarang, the capital city of Central Java province. During its operation, potential interruption of Inter-Bus Transformer (IBT) 500kV/150kV supply or frequency drop exceeding certain limits can cause the Ungaran Subsystem to form Island Operation. On May 30, 2020, the Ungaran Subsystem experienced a total blackout due to N-2 IBT disturbance, the island failed to form. Thus, due to its importance, maintaining the integrity of island operation in the Ungaran Subsystem is of high priority. The installed defense scheme is still static so that it is not flexible enough to cope with change of the distribution load and changes in the operating pattern of the power plant so that the success percentage of this static defense scheme is small. To increase the success rate of the island operation in the contingency event of loss of supply from the 500 kV system (IBT 500/150 kV) and frequency drop to 48.3 Hz, an adaptive island operation scheme is proposed. The success of the island operation scheme in the Ungaran subsystem can save the Tambaklorok Power Plant to avoid startup costs and speed up the recovery process. Based on the performed simulations, the proposed scheme could maintain the generation load balance during island operation and results in successful island operation. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Ungaran is one of the important subsystems in the Central Java system. This
subsystem is the main supplier of consumers to the significantly growing industrial
area in the north coast region, and also supplies the business center and the
government offices in Semarang, the capital city of Central Java province. During
its operation, potential interruption of Inter-Bus Transformer (IBT) 500kV/150kV
supply or frequency drop exceeding certain limits can cause the Ungaran
Subsystem to form Island Operation. On May 30, 2020, the Ungaran Subsystem
experienced a total blackout due to N-2 IBT disturbance, the island failed to form.
Thus, due to its importance, maintaining the integrity of island operation in the
Ungaran Subsystem is of high priority. The installed defense scheme is still static
so that it is not flexible enough to cope with change of the distribution load and
changes in the operating pattern of the power plant so that the success percentage
of this static defense scheme is small. To increase the success rate of the island
operation in the contingency event of loss of supply from the 500 kV system (IBT
500/150 kV) and frequency drop to 48.3 Hz, an adaptive island operation scheme
is proposed. The success of the island operation scheme in the Ungaran subsystem
can save the Tambaklorok Power Plant to avoid startup costs and speed up the
recovery process. Based on the performed simulations, the proposed scheme could
maintain the generation load balance during island operation and results in
successful island operation. |
format |
Theses |
author |
Nurzikry, Deliar |
spellingShingle |
Nurzikry, Deliar ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA |
author_facet |
Nurzikry, Deliar |
author_sort |
Nurzikry, Deliar |
title |
ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA |
title_short |
ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA |
title_full |
ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA |
title_fullStr |
ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA |
title_full_unstemmed |
ANALYSIS OF ADAPTIVE ISLAND OPERATION IN UNGARAN SUBSYSTEM CENTRAL JAVA |
title_sort |
analysis of adaptive island operation in ungaran subsystem central java |
url |
https://digilib.itb.ac.id/gdl/view/87110 |
_version_ |
1822999807945342976 |