OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON

A 150 kV High Voltage Overhead Line is a part of the electrical power transmission system. This line is highly susceptible to outages due to lightning stroke, which can cause voltage surges that may damage electrical equipment. Lightning is the most dominant cause of transmission outages in Indon...

Full description

Saved in:
Bibliographic Details
Main Author: Fathurrohman
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/87115
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:87115
spelling id-itb.:871152025-01-13T11:46:40ZOPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON Fathurrohman Indonesia Theses lightning, backflashover, flashover, Vaisala, Transmission Line Arrester (TLA), ATP. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/87115 A 150 kV High Voltage Overhead Line is a part of the electrical power transmission system. This line is highly susceptible to outages due to lightning stroke, which can cause voltage surges that may damage electrical equipment. Lightning is the most dominant cause of transmission outages in Indonesia. In the Bali Transmission Operating Unit area, 86% of transmission outages over the last 5 years have been caused by lightning. The 150 kV Gilimanuk – Celukan Bawang – Pemaron line, with a total length of 75.075 km and 240 towers, is a transmission line that frequently experiences outages due to lightning, as identified by Vaisala software. The analysis revealed that the outages were caused by backflashovers. Several corrective measures have been taken, including improving the grounding of transmission towers, connecting ground wires, and replacing insulators that experienced flashovers. Installing Transmission Line Arresters (TLA) is essential to reduce lightning-induced outages. Determining the optimal location for TLA installation on transmission lines to achieve minimal outage levels is not a simple task. In this study, the optimal and effective placement of TLA was determined using simulation tools such as ATPDraw (Alternative Transients Program). Further optimization is required to protect towers that are not directly shielded and to handle extremely high lightning strike currents. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description A 150 kV High Voltage Overhead Line is a part of the electrical power transmission system. This line is highly susceptible to outages due to lightning stroke, which can cause voltage surges that may damage electrical equipment. Lightning is the most dominant cause of transmission outages in Indonesia. In the Bali Transmission Operating Unit area, 86% of transmission outages over the last 5 years have been caused by lightning. The 150 kV Gilimanuk – Celukan Bawang – Pemaron line, with a total length of 75.075 km and 240 towers, is a transmission line that frequently experiences outages due to lightning, as identified by Vaisala software. The analysis revealed that the outages were caused by backflashovers. Several corrective measures have been taken, including improving the grounding of transmission towers, connecting ground wires, and replacing insulators that experienced flashovers. Installing Transmission Line Arresters (TLA) is essential to reduce lightning-induced outages. Determining the optimal location for TLA installation on transmission lines to achieve minimal outage levels is not a simple task. In this study, the optimal and effective placement of TLA was determined using simulation tools such as ATPDraw (Alternative Transients Program). Further optimization is required to protect towers that are not directly shielded and to handle extremely high lightning strike currents.
format Theses
author Fathurrohman
spellingShingle Fathurrohman
OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON
author_facet Fathurrohman
author_sort Fathurrohman
title OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON
title_short OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON
title_full OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON
title_fullStr OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON
title_full_unstemmed OPTIMIZATION OF TRANSMISSION LINE ARRESTER INSTALLATION TO REDUCE LIGHTNING OUTAGE RATE ON 150 KV TRANSMISSION LINES GILIMANUK – CELUKAN BAWANG - PEMARON
title_sort optimization of transmission line arrester installation to reduce lightning outage rate on 150 kv transmission lines gilimanuk – celukan bawang - pemaron
url https://digilib.itb.ac.id/gdl/view/87115
_version_ 1822999810881355776