RANCANGAN DAN ANALISIS KINERJA PEMBANGKIT LISTRIK TENAGA HIBRIDA GEOTERMAL-SURYA BERBASIS CLOSED-LOOP DI LAPANGAN PANAS BUMI SEMI-KONDUKTIF.
Today, geothermal and solar power generation technologies face power generation efficiency and operational sustainability challenges. Several regions in Indonesia are experiencing energy deficits, including East Nusa Tenggara (NTT), where the electrification rate is below 80%. Additionally, the elec...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87151 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!