#TITLE_ALTERNATIVE#
There is a finite volume of hydrocarbons that can be produced economically from any wells, field, or reservoir, which referred to as ultimate recovery and is equal to the reserve before production commences. As hydrocarbons are produced, reserves will decline as cumulative production increase, but t...
Saved in:
Main Author: | HIDAYATULLAH (NIM 12203050), NOR |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8834 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: HIDAYATULLAH (NIM 15104013), ASYSYARIF -
#TITLE_ALTERNATIVE#
by: HIDAYATULLAH (NIM 10104003), QONITA -
#TITLE_ALTERNATIVE#
by: Hidayatullah (NIM 271 04 001) , Taufan -
#TITLE_ALTERNATIVE#
by: MOHAMAD NOR (NIM 23604706), SAHLIZAWATI -
#TITLE_ALTERNATIVE#
by: JAZULI NOR ( NIM :20912004 ) PEMBIMBING : Dr. Eng. Suprijadi, FAIZ