FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)

This study develops a framework for ERP system post-project. It presents essential ideas and theoretical backgrounds through in-depth literature review in the areas of ERP system post-project <br /> <br /> <br /> The main research question in this study is: how to execute ERP sys...

Full description

Saved in:
Bibliographic Details
Main Author: MUHARNI (NIM 23406018), YUSRAINI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/9725
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:9725
spelling id-itb.:97252017-09-27T14:50:36ZFRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia) MUHARNI (NIM 23406018), YUSRAINI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/9725 This study develops a framework for ERP system post-project. It presents essential ideas and theoretical backgrounds through in-depth literature review in the areas of ERP system post-project <br /> <br /> <br /> The main research question in this study is: how to execute ERP system post-project that will increase benefit for company? This question will be answered by the following questions: (1) What are the processes important to be execute in the ERP system post-project?, (2) What are the major activities in each process?, and (3) How the overall activities in the process will contribute in achieving benefit to company? <br /> <br /> <br /> To answer research questions, the following steps are conducted: (1) developing of framework that could help in explaining how activities in ERP system post-project take place, (2) conducting empirical investigation through the execution of two case studies in Indonesia, and (3) analizing the result of the two case studies in order to be able to raise some conclusions that related to the benefit of ERP system post-project activities. Two case studies had been conducted. Personal interviews were executed. The interview protocol consists of a number of open ended semi structured questions to allow interviewer clarify specific issues in the discussion. In total 7 interviews were done. Each interviews lasted between 30 until 90 minutes. They were recorded and transcribed in full. <br /> <br /> <br /> Based on case study in two companies this research shows how a firm conduct their Enterprise Resource Planning (ERP) post-project activities. This research concludes by providing a framework of ERP system post-project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This study develops a framework for ERP system post-project. It presents essential ideas and theoretical backgrounds through in-depth literature review in the areas of ERP system post-project <br /> <br /> <br /> The main research question in this study is: how to execute ERP system post-project that will increase benefit for company? This question will be answered by the following questions: (1) What are the processes important to be execute in the ERP system post-project?, (2) What are the major activities in each process?, and (3) How the overall activities in the process will contribute in achieving benefit to company? <br /> <br /> <br /> To answer research questions, the following steps are conducted: (1) developing of framework that could help in explaining how activities in ERP system post-project take place, (2) conducting empirical investigation through the execution of two case studies in Indonesia, and (3) analizing the result of the two case studies in order to be able to raise some conclusions that related to the benefit of ERP system post-project activities. Two case studies had been conducted. Personal interviews were executed. The interview protocol consists of a number of open ended semi structured questions to allow interviewer clarify specific issues in the discussion. In total 7 interviews were done. Each interviews lasted between 30 until 90 minutes. They were recorded and transcribed in full. <br /> <br /> <br /> Based on case study in two companies this research shows how a firm conduct their Enterprise Resource Planning (ERP) post-project activities. This research concludes by providing a framework of ERP system post-project.
format Theses
author MUHARNI (NIM 23406018), YUSRAINI
spellingShingle MUHARNI (NIM 23406018), YUSRAINI
FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)
author_facet MUHARNI (NIM 23406018), YUSRAINI
author_sort MUHARNI (NIM 23406018), YUSRAINI
title FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)
title_short FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)
title_full FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)
title_fullStr FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)
title_full_unstemmed FRAMEWORK DEVELOPMENT OF ERP POST-PROJECT (Case Study in Two Big Companies in Indonesia)
title_sort framework development of erp post-project (case study in two big companies in indonesia)
url https://digilib.itb.ac.id/gdl/view/9725
_version_ 1820664777970548736