#TITLE_ALTERNATIVE#
Well testing that determines the well performance theoretically should reach pseudo steady state condition considering IPR curve that describe productivity of well on this condition. The time to reach pseudo steady state condition is influenced by layer permeability whereas low value of permeability...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/9768 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:9768 |
---|---|
spelling |
id-itb.:97682017-09-27T10:37:31Z#TITLE_ALTERNATIVE# SATIM (NIM 12204022), ADEK Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/9768 Well testing that determines the well performance theoretically should reach pseudo steady state condition considering IPR curve that describe productivity of well on this condition. The time to reach pseudo steady state condition is influenced by layer permeability whereas low value of permeability will cause long time to reach pseudo steady state condition. This final project discuss about the generation of equation to determine performance on production well at pseudo steady state condition based on well testing result at transient condition. This method is developed from single well model that is built on commercial simulator CMG. This model represents solution gas drive gas reservoir with low permeability. By using this model, IPR on transient condition is generated and developed to pseudo steady state condition IPR based on well testing at transient condition. Development on the equation generated in this final project is still needed, for example by validating this equation with real time well testing result. <br /> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Well testing that determines the well performance theoretically should reach pseudo steady state condition considering IPR curve that describe productivity of well on this condition. The time to reach pseudo steady state condition is influenced by layer permeability whereas low value of permeability will cause long time to reach pseudo steady state condition. This final project discuss about the generation of equation to determine performance on production well at pseudo steady state condition based on well testing result at transient condition. This method is developed from single well model that is built on commercial simulator CMG. This model represents solution gas drive gas reservoir with low permeability. By using this model, IPR on transient condition is generated and developed to pseudo steady state condition IPR based on well testing at transient condition. Development on the equation generated in this final project is still needed, for example by validating this equation with real time well testing result. <br />
|
format |
Final Project |
author |
SATIM (NIM 12204022), ADEK |
spellingShingle |
SATIM (NIM 12204022), ADEK #TITLE_ALTERNATIVE# |
author_facet |
SATIM (NIM 12204022), ADEK |
author_sort |
SATIM (NIM 12204022), ADEK |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/9768 |
_version_ |
1820664790021832704 |