#TITLE_ALTERNATIVE#
This final duty analyse about potential market demand of Wing in Surface Effect craft (Wise-8) if it is operated regularly. Analysis include the determination of potential route for Wise-8 and forecasting the amount of plane is needed in the next 10 years.<p> <br /> <br /> <br...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/9868 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:9868 |
---|---|
spelling |
id-itb.:98682017-10-09T10:33:28Z#TITLE_ALTERNATIVE# (NIM 13602009), ALDRING Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/9868 This final duty analyse about potential market demand of Wing in Surface Effect craft (Wise-8) if it is operated regularly. Analysis include the determination of potential route for Wise-8 and forecasting the amount of plane is needed in the next 10 years.<p> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Route determination is done by analysing the amount of market demand in every route. By using the method of modal split and linier regression, a general equation is formed. This equation will be used in determining market demand of WiSE-8 in every route. After the market demand of each route is determined, by knowing the transportation growth each year, the amount of plane is needed in next 10 years can be predicted.<p> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> From the analysis result of this study, Batam-Dumai and Batam Kuala Tungkal are two routes which have high priority for operating WiSE-8 craft. It is based on high market demand and technical operating environment of WiSE-8 in those routes. With the transportation growth of 13.6% per year, the amount of plane which is needed within 10 years around 115 planes in total. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
This final duty analyse about potential market demand of Wing in Surface Effect craft (Wise-8) if it is operated regularly. Analysis include the determination of potential route for Wise-8 and forecasting the amount of plane is needed in the next 10 years.<p> <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Route determination is done by analysing the amount of market demand in every route. By using the method of modal split and linier regression, a general equation is formed. This equation will be used in determining market demand of WiSE-8 in every route. After the market demand of each route is determined, by knowing the transportation growth each year, the amount of plane is needed in next 10 years can be predicted.<p> <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
From the analysis result of this study, Batam-Dumai and Batam Kuala Tungkal are two routes which have high priority for operating WiSE-8 craft. It is based on high market demand and technical operating environment of WiSE-8 in those routes. With the transportation growth of 13.6% per year, the amount of plane which is needed within 10 years around 115 planes in total. |
format |
Final Project |
author |
(NIM 13602009), ALDRING |
spellingShingle |
(NIM 13602009), ALDRING #TITLE_ALTERNATIVE# |
author_facet |
(NIM 13602009), ALDRING |
author_sort |
(NIM 13602009), ALDRING |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/9868 |
_version_ |
1822016171942084608 |