#TITLE_ALTERNATIVE#
Marine current power plant was develop very fast. but cost of construction and power transmission still expensive and not suitable for remote area.<p> <br /> <br /> <br /> <br /> <br /> This thesis concern to application marine current power plant as water flow...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/9933 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:9933 |
---|---|
spelling |
id-itb.:99332017-09-27T10:18:43Z#TITLE_ALTERNATIVE# WAHYUDI (NIM 13203158), ANDRI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/9933 Marine current power plant was develop very fast. but cost of construction and power transmission still expensive and not suitable for remote area.<p> <br /> <br /> <br /> <br /> <br /> This thesis concern to application marine current power plant as water flow power plant for river in Bandung area. do study for choosing suit marine current power plant, thus choose gorlov turbine with 35 % effisiensi and TSR 2-2.2.<p> <br /> <br /> <br /> <br /> <br /> The suit river for application marrine current power plant as water flow power plant for river in bandung area are citarum dayeuh kolot river that has 1035 km2 drift has power potention 93.61 kW and citarum nanjung river that has 1035 km2 drift has power potention 93.61 kW. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Marine current power plant was develop very fast. but cost of construction and power transmission still expensive and not suitable for remote area.<p> <br />
<br />
<br />
<br />
<br />
This thesis concern to application marine current power plant as water flow power plant for river in Bandung area. do study for choosing suit marine current power plant, thus choose gorlov turbine with 35 % effisiensi and TSR 2-2.2.<p> <br />
<br />
<br />
<br />
<br />
The suit river for application marrine current power plant as water flow power plant for river in bandung area are citarum dayeuh kolot river that has 1035 km2 drift has power potention 93.61 kW and citarum nanjung river that has 1035 km2 drift has power potention 93.61 kW. |
format |
Final Project |
author |
WAHYUDI (NIM 13203158), ANDRI |
spellingShingle |
WAHYUDI (NIM 13203158), ANDRI #TITLE_ALTERNATIVE# |
author_facet |
WAHYUDI (NIM 13203158), ANDRI |
author_sort |
WAHYUDI (NIM 13203158), ANDRI |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/9933 |
_version_ |
1820664837608308736 |