SISTEM AKUNTANSI PERTANGGUNG JAWABAN DAN PENENTUAN KEY PERFORMANCE INDICATORS DENGAN KONSEP BSC DlTINJAU DARI ASPEK PERILAKU STUDI KASUS PADA PERGURUAN TlNGGI SWASTA"X" Di SURABAYA

Objective of this study was to find out further the impact of planning and budgeting processes and performance measurement on the behavior as wel as key performance indicator measurement of responsibility center manager based on Balanced Scorecard concept Method used in 1his study was quaIitati...

Full description

Saved in:
Bibliographic Details
Main Author: Endang Dwi Retnani, 090114430 M
Format: Theses and Dissertations NonPeerReviewed
Language:English
Indonesian
Published: 2005
Subjects:
Online Access:http://repository.unair.ac.id/82533/1/ABSTRACT.pdf
http://repository.unair.ac.id/82533/2/KK%20TEA%2009%20-08%20RET%20S.pdf
http://repository.unair.ac.id/82533/
http://lib.unair.ac.id
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Airlangga
Language: English
Indonesian
Description
Summary:Objective of this study was to find out further the impact of planning and budgeting processes and performance measurement on the behavior as wel as key performance indicator measurement of responsibility center manager based on Balanced Scorecard concept Method used in 1his study was quaIitative research spproach