THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS

The main objective is to provide an innovative and a feasible solution for the users and railway industry. to reduce the waiting time, misuse and violating behaviour thus, reduce the risk at the UWCs. There is long waiting time for the driver to gain train position information and permission at the...

Full description

Saved in:
Bibliographic Details
Main Authors: , EBEN TORSA TONGAM, , Prof. Dr. Ir. Siti Malkamah, M.Sc.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/118739/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=58714
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.118739
record_format dspace
spelling id-ugm-repo.1187392016-03-04T08:33:01Z https://repository.ugm.ac.id/118739/ THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS , EBEN TORSA TONGAM , Prof. Dr. Ir. Siti Malkamah, M.Sc., ETD The main objective is to provide an innovative and a feasible solution for the users and railway industry. to reduce the waiting time, misuse and violating behaviour thus, reduce the risk at the UWCs. There is long waiting time for the driver to gain train position information and permission at the UWC-T. The average is eight minutes and 36 minutes in extreme cases. This may cause the user become impatient or unwilling to wait for unspecific period and increase the violation behaviour at the crossings. Thus, it could bring catastrophic risk or Potentially Higher-Risk Train Accidents (PHRTAs) to both road vehicle occupants, train crew, and train occupants particularly when the train collide with heavy goods vehicles (lorries and farming tractors). In order to develop an innovative, feasible system to reduce the risk and enhance the existing system and in terms of information provision, the author uses Vee process. It is the recommended tool in system engineering regarding the implementation of new system since there is stakeholder requirements analysis in order to avoid stakeholder negligence, overtime and over-budget. Thereby, this new system will provide advantages to the users, infrastructure owner, comply with standards and legislations and also ALARP principle to keep the risk as low as reasonably practicable. Moreover, it can solve not only to one single UWC but also to the several UWCs in the branch line, thus it is a feasible solution to reduce the risk and improve safety at UWCs. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , EBEN TORSA TONGAM and , Prof. Dr. Ir. Siti Malkamah, M.Sc., (2013) THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=58714
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, EBEN TORSA TONGAM
, Prof. Dr. Ir. Siti Malkamah, M.Sc.,
THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS
description The main objective is to provide an innovative and a feasible solution for the users and railway industry. to reduce the waiting time, misuse and violating behaviour thus, reduce the risk at the UWCs. There is long waiting time for the driver to gain train position information and permission at the UWC-T. The average is eight minutes and 36 minutes in extreme cases. This may cause the user become impatient or unwilling to wait for unspecific period and increase the violation behaviour at the crossings. Thus, it could bring catastrophic risk or Potentially Higher-Risk Train Accidents (PHRTAs) to both road vehicle occupants, train crew, and train occupants particularly when the train collide with heavy goods vehicles (lorries and farming tractors). In order to develop an innovative, feasible system to reduce the risk and enhance the existing system and in terms of information provision, the author uses Vee process. It is the recommended tool in system engineering regarding the implementation of new system since there is stakeholder requirements analysis in order to avoid stakeholder negligence, overtime and over-budget. Thereby, this new system will provide advantages to the users, infrastructure owner, comply with standards and legislations and also ALARP principle to keep the risk as low as reasonably practicable. Moreover, it can solve not only to one single UWC but also to the several UWCs in the branch line, thus it is a feasible solution to reduce the risk and improve safety at UWCs.
format Theses and Dissertations
NonPeerReviewed
author , EBEN TORSA TONGAM
, Prof. Dr. Ir. Siti Malkamah, M.Sc.,
author_facet , EBEN TORSA TONGAM
, Prof. Dr. Ir. Siti Malkamah, M.Sc.,
author_sort , EBEN TORSA TONGAM
title THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS
title_short THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS
title_full THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS
title_fullStr THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS
title_full_unstemmed THE USE OF 2D BAR CODE ON USER-WORKED CROSSINGS
title_sort use of 2d bar code on user-worked crossings
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/118739/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=58714
_version_ 1681231015827210240