STUDI INTERKONEKSI SUMUR INJEKSI TERHADAP SUMUR PRODUKSI DENGAN METODE ISOTOP ALAM (2 H DAN 18 O) DI LAPANGAN MINYAK TALANG JIMAR, PT. PERTAMINA EPREGION SUMATERA, FIELD PRABUMULIH
The research to study the interconnection of injection wells toward production wells has been conducted in Talang Jimar Oil Field, PT. Pertamina Sumatera Region, Prabumulih Field with natural isotopes (2H and 18O) method. The first purpose of this research is to know the interconnection of injection...
Saved in:
Main Authors: | , RIZKY PADUTAMA, , Ir. Agus Budhie Wijatna, M.Si. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/121330/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61413 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
STUDI INTERKONEKSI ANTARA SUMUR REINJEKSI DENGAN
SUMUR PRODUKSI DAN ANALISIS MASS RECOVERY
DENGAN METODE ISOTOP STABIL
18
O DAN DI LAPANGAN
PANAS BUMI KAMOJANG, JAWA BARAT
by: D. Febriani, D. Febriani, et al.
Published: (2014) -
HUBUNGAN POSISI KERJA DENGAN KELUHAN MUSKULOSKELETAL
PADA PEKERJA PERAWATAN SUMUR MINYAK DI PT. PERTAMINA EP
ASSET 2 PRABUMULIH FIELD
by: NARESHWARI, 101411123088
Published: (2017) -
Perencanaan proyek pemboran sumur Tambun 06 di lapangan minyak Pertamina daerah operasi hulu Jawa bagian barat
by: , WINDYAWAN, Pramoko Ari, et al.
Published: (2002) -
PENENTUAN LOKASI SUMUR INJEKSI LAPANGAN � FM �, CEKUNGAN JAWA BARAT UTARA DENGAN METODE INVERSI IMPEDANSI AKUSTIK DAN SEISMIK ATRIBUT
by: , FAISAL MUHAMMAD, et al.
Published: (2014) -
Analisis investasi pada pengeboran sumur KBB-01 Pertamina EP Region Jawa
by: , NASUTION, Adam Syukron, et al.
Published: (2008)