PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI

Bina Agro Mandiri is a medium-scale industry fostered by CV Yogya Visiprima which engages in the processing of agricultural material products with its main raw material is simplisia that is made into herbal medicines in the form of herbs powder in capsules. The low awareness of the workers to work o...

Full description

Saved in:
Bibliographic Details
Main Authors: , NURUL WINDIANI PUTRI, , Ir. Pujo Saroyo, M. Eng. Sc
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/122309/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62410
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.122309
record_format dspace
spelling id-ugm-repo.1223092016-03-04T08:04:53Z https://repository.ugm.ac.id/122309/ PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI , NURUL WINDIANI PUTRI , Ir. Pujo Saroyo, M. Eng. Sc ETD Bina Agro Mandiri is a medium-scale industry fostered by CV Yogya Visiprima which engages in the processing of agricultural material products with its main raw material is simplisia that is made into herbal medicines in the form of herbs powder in capsules. The low awareness of the workers to work optimally affects a company in achieving the productivity height. It is due to an imbalance between the workload and the number of workers. This research was conducted which aimed to measure the workers standard time in respective packaging station operation, and to determine the number of the workers in the packaging stations based on the standard time. Thus, the number of the workers required according to the workload can be determined. Therefore, the workers can work effectively and efficiently. Based on the results of the workers number calculation performed in CV. Bina Agro Mandiri, apparently there is an imbalance of the workers in the packaging stations of the herbal medicine product. The number of the workers required is 17 [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , NURUL WINDIANI PUTRI and , Ir. Pujo Saroyo, M. Eng. Sc (2014) PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62410
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, NURUL WINDIANI PUTRI
, Ir. Pujo Saroyo, M. Eng. Sc
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
description Bina Agro Mandiri is a medium-scale industry fostered by CV Yogya Visiprima which engages in the processing of agricultural material products with its main raw material is simplisia that is made into herbal medicines in the form of herbs powder in capsules. The low awareness of the workers to work optimally affects a company in achieving the productivity height. It is due to an imbalance between the workload and the number of workers. This research was conducted which aimed to measure the workers standard time in respective packaging station operation, and to determine the number of the workers in the packaging stations based on the standard time. Thus, the number of the workers required according to the workload can be determined. Therefore, the workers can work effectively and efficiently. Based on the results of the workers number calculation performed in CV. Bina Agro Mandiri, apparently there is an imbalance of the workers in the packaging stations of the herbal medicine product. The number of the workers required is 17
format Theses and Dissertations
NonPeerReviewed
author , NURUL WINDIANI PUTRI
, Ir. Pujo Saroyo, M. Eng. Sc
author_facet , NURUL WINDIANI PUTRI
, Ir. Pujo Saroyo, M. Eng. Sc
author_sort , NURUL WINDIANI PUTRI
title PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
title_short PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
title_full PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
title_fullStr PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
title_full_unstemmed PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
title_sort penentuan jumlah tenaga kerja di stasiun pengemasan berdasarkan studi waktu standar di cv. bina agro mandiri
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/122309/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62410
_version_ 1681231679000150016