PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
Bina Agro Mandiri is a medium-scale industry fostered by CV Yogya Visiprima which engages in the processing of agricultural material products with its main raw material is simplisia that is made into herbal medicines in the form of herbs powder in capsules. The low awareness of the workers to work o...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/122309/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62410 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.122309 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1223092016-03-04T08:04:53Z https://repository.ugm.ac.id/122309/ PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI , NURUL WINDIANI PUTRI , Ir. Pujo Saroyo, M. Eng. Sc ETD Bina Agro Mandiri is a medium-scale industry fostered by CV Yogya Visiprima which engages in the processing of agricultural material products with its main raw material is simplisia that is made into herbal medicines in the form of herbs powder in capsules. The low awareness of the workers to work optimally affects a company in achieving the productivity height. It is due to an imbalance between the workload and the number of workers. This research was conducted which aimed to measure the workers standard time in respective packaging station operation, and to determine the number of the workers in the packaging stations based on the standard time. Thus, the number of the workers required according to the workload can be determined. Therefore, the workers can work effectively and efficiently. Based on the results of the workers number calculation performed in CV. Bina Agro Mandiri, apparently there is an imbalance of the workers in the packaging stations of the herbal medicine product. The number of the workers required is 17 [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , NURUL WINDIANI PUTRI and , Ir. Pujo Saroyo, M. Eng. Sc (2014) PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62410 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , NURUL WINDIANI PUTRI , Ir. Pujo Saroyo, M. Eng. Sc PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI |
description |
Bina Agro Mandiri is a medium-scale industry fostered by CV Yogya
Visiprima which engages in the processing of agricultural material products with its
main raw material is simplisia that is made into herbal medicines in the form of herbs
powder in capsules. The low awareness of the workers to work optimally affects a
company in achieving the productivity height. It is due to an imbalance between the
workload and the number of workers.
This research was conducted which aimed to measure the workers standard
time in respective packaging station operation, and to determine the number of the
workers in the packaging stations based on the standard time. Thus, the number of the
workers required according to the workload can be determined. Therefore, the
workers can work effectively and efficiently.
Based on the results of the workers number calculation performed in CV.
Bina Agro Mandiri, apparently there is an imbalance of the workers in the packaging
stations of the herbal medicine product. The number of the workers required is 17 |
format |
Theses and Dissertations NonPeerReviewed |
author |
, NURUL WINDIANI PUTRI , Ir. Pujo Saroyo, M. Eng. Sc |
author_facet |
, NURUL WINDIANI PUTRI , Ir. Pujo Saroyo, M. Eng. Sc |
author_sort |
, NURUL WINDIANI PUTRI |
title |
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN
PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR
DI CV. BINA AGRO MANDIRI |
title_short |
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN
PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR
DI CV. BINA AGRO MANDIRI |
title_full |
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN
PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR
DI CV. BINA AGRO MANDIRI |
title_fullStr |
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN
PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR
DI CV. BINA AGRO MANDIRI |
title_full_unstemmed |
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN
PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR
DI CV. BINA AGRO MANDIRI |
title_sort |
penentuan jumlah tenaga kerja di stasiun
pengemasan berdasarkan studi waktu standar
di cv. bina agro mandiri |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2014 |
url |
https://repository.ugm.ac.id/122309/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62410 |
_version_ |
1681231679000150016 |