IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI

While doing internship in PT. PANATA JAYA MANDIRI, the writer was positioned in Production section II, at line seaming assy. line seaming assy, is an assembly process of filter components into a whole filter. Through the internship process, the writer observed and noted the cycle time on the line se...

Full description

Saved in:
Bibliographic Details
Main Authors: , ORI SOBARI, , Ir. Andr. Surjaka Isp, M.T.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/122408/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62510
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.122408
record_format dspace
spelling id-ugm-repo.1224082016-03-04T08:41:37Z https://repository.ugm.ac.id/122408/ IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI , ORI SOBARI , Ir. Andr. Surjaka Isp, M.T., ETD While doing internship in PT. PANATA JAYA MANDIRI, the writer was positioned in Production section II, at line seaming assy. line seaming assy, is an assembly process of filter components into a whole filter. Through the internship process, the writer observed and noted the cycle time on the line seaming assy. The writer saw that there was a lack of effectiveness and efficiency, which was the positioning of the filter, that was already seamed, into the conveyor machine. In the production process, the storage filter process after the seaming, often experience problems from inaccuracy of the positioning of filter in the conveyor. After the writer further analyze the storage process of the filter in the conveyor, the writer concluded that the cause of the ineffectiveness is the height of seamer machine table was not in line with the height of the conveyor. So the writer gave an advice to the staff engineering to improve the line seaming assy by adding the height of the foot of the conveyor. After receiving approval from the staf engineering, the writer immediately designed the increase height of the conveyor machine. Because of the improvement in the conveyors� prop, the time of the filter storing process has become more effective and efficient. It saves time up to 0,46 seconds and the production on the line seaming assy increases to 20%. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , ORI SOBARI and , Ir. Andr. Surjaka Isp, M.T., (2013) IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62510
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, ORI SOBARI
, Ir. Andr. Surjaka Isp, M.T.,
IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI
description While doing internship in PT. PANATA JAYA MANDIRI, the writer was positioned in Production section II, at line seaming assy. line seaming assy, is an assembly process of filter components into a whole filter. Through the internship process, the writer observed and noted the cycle time on the line seaming assy. The writer saw that there was a lack of effectiveness and efficiency, which was the positioning of the filter, that was already seamed, into the conveyor machine. In the production process, the storage filter process after the seaming, often experience problems from inaccuracy of the positioning of filter in the conveyor. After the writer further analyze the storage process of the filter in the conveyor, the writer concluded that the cause of the ineffectiveness is the height of seamer machine table was not in line with the height of the conveyor. So the writer gave an advice to the staff engineering to improve the line seaming assy by adding the height of the foot of the conveyor. After receiving approval from the staf engineering, the writer immediately designed the increase height of the conveyor machine. Because of the improvement in the conveyors� prop, the time of the filter storing process has become more effective and efficient. It saves time up to 0,46 seconds and the production on the line seaming assy increases to 20%.
format Theses and Dissertations
NonPeerReviewed
author , ORI SOBARI
, Ir. Andr. Surjaka Isp, M.T.,
author_facet , ORI SOBARI
, Ir. Andr. Surjaka Isp, M.T.,
author_sort , ORI SOBARI
title IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI
title_short IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI
title_full IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI
title_fullStr IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI
title_full_unstemmed IMPROVEMENT PENYANGGA MESIN CONVEYOR PADA LINE SEAMING ASSY DI PT. PANATA JAYA MANDIRI
title_sort improvement penyangga mesin conveyor pada line seaming assy di pt. panata jaya mandiri
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/122408/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62510
_version_ 1681231697512759296