PERBANDINGAN WAKTU DAN BIAYA PELEBURAN ALUMINIUM DENGAN DAPUR LEBUR GAS LPG DAN DAPUR LISTRIK
The furnace with kerosene fuel have many heat energy lost in melt aluminium process, low efficient of melting material. This is not safety which price of kerosene is expensive and difficult to find it. Furnace tube was made by cutting plat process, rolling, maked a hole and welding the metal sheet....
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/122451/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62553 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |