PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100
The goal and the designing of this thesis is to learn and to know the work of alternator that used regulator and IC regulator in the charging system of trainer engine suzuki carry ST100. The first method is to serve the manual book as the guiding book to avoid the mistakes in the testing and the mea...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/122555/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62659 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.122555 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1225552016-03-04T08:27:57Z https://repository.ugm.ac.id/122555/ PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 , BINTORO JUANG SIHALOHO , Ir. Susanto Johanes, MT. ETD The goal and the designing of this thesis is to learn and to know the work of alternator that used regulator and IC regulator in the charging system of trainer engine suzuki carry ST100. The first method is to serve the manual book as the guiding book to avoid the mistakes in the testing and the measure of components charging system. The second method is to design the electricity in the charging system of trainer engine suzuki carry ST100 and measure of components engine suzuki cary ST100. The Third method is to testing at trainer engine suzuki ST100, which is alternator change of mechanical energy from engine become eletrical energy alternating current (AC). After that, the current flow to regulator for adjust electrical current that into rotor coil. After that, alternating current (AC) come in to the rectifier for change as direct current (DC) and saved to batery. By the testing measuring been done, can be known that the a part of charging system is appropriate to the factory standardization, so that there is a little possibility of charging problem to be happened, and the machine that is hard to work on this engine trainer suzuki carry ST100. By doing the testing, that machine is deserve as a sporting on the practice. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , BINTORO JUANG SIHALOHO and , Ir. Susanto Johanes, MT. (2013) PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62659 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , BINTORO JUANG SIHALOHO , Ir. Susanto Johanes, MT. PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 |
description |
The goal and the designing of this thesis is to learn and to know the work
of alternator that used regulator and IC regulator in the charging system of
trainer engine suzuki carry ST100.
The first method is to serve the manual book as the guiding book to avoid
the mistakes in the testing and the measure of components charging system. The
second method is to design the electricity in the charging system of trainer engine
suzuki carry ST100 and measure of components engine suzuki cary ST100. The
Third method is to testing at trainer engine suzuki ST100, which is alternator
change of mechanical energy from engine become eletrical energy alternating
current (AC). After that, the current flow to regulator for adjust electrical current
that into rotor coil. After that, alternating current (AC) come in to the rectifier for
change as direct current (DC) and saved to batery.
By the testing measuring been done, can be known that the a part of
charging system is appropriate to the factory standardization, so that there is a
little possibility of charging problem to be happened, and the machine that is
hard to work on this engine trainer suzuki carry ST100. By doing the testing, that
machine is deserve as a sporting on the practice. |
format |
Theses and Dissertations NonPeerReviewed |
author |
, BINTORO JUANG SIHALOHO , Ir. Susanto Johanes, MT. |
author_facet |
, BINTORO JUANG SIHALOHO , Ir. Susanto Johanes, MT. |
author_sort |
, BINTORO JUANG SIHALOHO |
title |
PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 |
title_short |
PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 |
title_full |
PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 |
title_fullStr |
PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 |
title_full_unstemmed |
PERANCANGAN SISTEM PENGISIAN PADA ENGINE TRAINER SUZUKI CARRY ST 100 |
title_sort |
perancangan sistem pengisian pada engine trainer suzuki carry st 100 |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2013 |
url |
https://repository.ugm.ac.id/122555/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62659 |
_version_ |
1681231725236060160 |