SCHEDULING TENAGA KERJA PEKERJAAN PIER R2 SAMPAI ABUTMENT A3 PROYEK FLY OVER (FO) JOMBOR
Man power is one of the resources to be a critical success factor in the implementation of the project. As well as on the job Pier R2 up to Abutment A3 on development projects Fly Over (FO) Jombor, the amount of power supply, the type of skills and expertise should follow the changing demands of the...
Saved in:
Main Authors: | , HENING AGUSTYA, , Dian Sestining Ayu, ST., MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/122655/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62758 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA
by: , SOBITA MARCHKY PERMATASARI, et al.
Published: (2013) -
METODE PELAKSANAAN PEKERJAAN RAMP FLY OVER JOMBOR YOGYAKARTA
by: , EKA MARIS CAHYA PUTRA, et al.
Published: (2013) -
ANALISIS STRUKTUR BANGUNAN BAWAH (ABUTMENT) ABT.2.FO JEMBATAN FLY OVER KALIBANTENG SEMARANG PT ADHI KARYA PERSERO Tbk
by: , ARMA YUDHIANTO, et al.
Published: (2013) -
ANALISIS STRUKTUR PILAR R3 FLYOVER JOMBOR DI PROPINSI DIY
by: , ATINA TUNGGA DEWI, et al.
Published: (2013) -
TINJAUAN JAM OPERASIONAL TOWER CRANE (STUDI KASUS PADA PEKERJAAN STRUKTUR PROYEK MALL BINTARO XCHANGE)
by: , MEUTIA WIDYA HERNINGRUM, et al.
Published: (2013)