ANALISIS YURIDIS TERHADAP PEMBERIAN HAK GUNA BANGUNAN TANPA JANGKA WAKTU DIATAS TANAH HAK PENGELOLAAN YANG MENJADI JAMINAN KREDIT
This research intent to know Utilised Rights legal power Building at aboveground Right For Management without be attached duration on its rights certificate and to know effect law doesn't be attached its duration on Utilised Rights certificate Building at aboveground Right For Management in Res...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/123170/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=63281 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Summary: | This research intent to know Utilised Rights legal power Building at
aboveground Right For Management without be attached duration on its rights
certificate and to know effect law doesn't be attached its duration on Utilised
Rights certificate Building at aboveground Right For Management in
Responsibility Rights imposition
Observational performing to be done by preparation step,one that began by
phase pre research to look for, gather, check and notes reputed material relevant
with observational object, drawned out by observational proposal writing with pass
through consultation process with counsellor lecturer. After observational proposal
to be agreed drawned out by instrument's collation research and observational
permit management. Hereafter observational performing phase which is do
bibliography and field research research and sequel data collecting to complete
startup data. Last is batting average, which is do activity that cover collation and
data processing,analisis is data,early writing until final reporting collation. This
research utilize research approaching sentences normatif which is research which
mengkaji an about problem bases prevailing legislation regulation.
This observational result is that despite doesn't be set down its a given time
period on Utilised Rights certificate Building at by right of that Management but
aboveground rights legal power that equals the other aboveground rights
terminological UUPA and Rights assembly process Responsibility makes a abode
to get is done for from certificate publication date can pull maximal duration of
right for aboveground that, along imposition performing process responsibility
rights is done accords prevailing legislation rule. |
---|