ANALISIS YURIDIS TERHADAP PEMBERIAN HAK GUNA BANGUNAN TANPA JANGKA WAKTU DIATAS TANAH HAK PENGELOLAAN YANG MENJADI JAMINAN KREDIT

This research intent to know Utilised Rights legal power Building at aboveground Right For Management without be attached duration on its rights certificate and to know effect law doesn't be attached its duration on Utilised Rights certificate Building at aboveground Right For Management in Res...

Full description

Saved in:
Bibliographic Details
Main Authors: , winny arianila, , Pitaya SH, M.Hum.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/123170/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=63281
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Description
Summary:This research intent to know Utilised Rights legal power Building at aboveground Right For Management without be attached duration on its rights certificate and to know effect law doesn't be attached its duration on Utilised Rights certificate Building at aboveground Right For Management in Responsibility Rights imposition Observational performing to be done by preparation step,one that began by phase pre research to look for, gather, check and notes reputed material relevant with observational object, drawned out by observational proposal writing with pass through consultation process with counsellor lecturer. After observational proposal to be agreed drawned out by instrument's collation research and observational permit management. Hereafter observational performing phase which is do bibliography and field research research and sequel data collecting to complete startup data. Last is batting average, which is do activity that cover collation and data processing,analisis is data,early writing until final reporting collation. This research utilize research approaching sentences normatif which is research which mengkaji an about problem bases prevailing legislation regulation. This observational result is that despite doesn't be set down its a given time period on Utilised Rights certificate Building at by right of that Management but aboveground rights legal power that equals the other aboveground rights terminological UUPA and Rights assembly process Responsibility makes a abode to get is done for from certificate publication date can pull maximal duration of right for aboveground that, along imposition performing process responsibility rights is done accords prevailing legislation rule.