PENELITIAN EFISIENSI PUMP AS TURBINE (PAT) UNTUK MENDUKUNG PERENCANAAN DAN IMPLEMENTASI PLTMh DI KABUPATEN SUMBAWA

The energy crisis will come soon, the consumption behavior and economic elevating will advance the energy depletion. The demand of power electrical around 4.000 � 5.000 MW per year will difficult to fix, if we just rely on fossil energy because of the increasing oil world price. The water energy i...

Full description

Saved in:
Bibliographic Details
Main Authors: , ALFIAN RUSDI, , Dr.-Ing. Ir. Agus Maryono.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/123337/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=63448
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada