ANALISIS CAPACITY CONSTRAINED WORKER (CCW) DENGAN PENDEKATAN WAKTU BAKU DAN DENYUT JANTUNG PEKERJA (STUDI PADA : INDUSTRI TEMPE �MUCHLAR�KASIHAN BANTUL YOGYAKARTA)
One of the factors of production that plays an important role in determining the efficiency and effectiveness of production is worker. worker can also be an obstacle for an industry which, if not identified could disturb the goal. One of the concepts that can be used to identify any constraints exis...
Saved in:
Main Authors: | , MAMAN ZURIWIATMA, , Dr. Ir. Endy Suwondo, DEA |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/124252/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64372 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
by: , AGRA ZULFANUDDIN, et al.
Published: (2014) -
ANALISIS TINGKAT PENDAPATAN BERSIH PRODUKSI TEMPE MENGGUNAKAN CAPACITY CONSTRAINED RESOURCES (CCR) DALAM THEORY OF CONSTRAINT (TOC)
(Studi Kasus di UKM Tempe Murni H. Muchlar, Kasihan, Bantul)
by: , SAFRUDIN DWI RA, et al.
Published: (2013) -
PURWARUPA SISTEM PENGHITUNG DENYUT JANTUNG BERBASIS MIKROKONTROLLER ATMEGA32
by: , REZA SANI SATRIA, et al.
Published: (2013) -
Membandingkan Efek Pemanasan 30%, 50% Dan 70% Cadangan Denyut Jantung Maksimal Terhadap Waktu Tempuh Lari 400 Meter
by: Darwis Durahim, -
Published: (2023) -
Pembuatan Alat Ukur Frekuensi Rendah untuk Pengukur Cacah Denyut Jantung
by: Santoso, Teguh
Published: (1988)