PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA

A transformer is an electrical apparatus that can move or transfer electrical energi and converts electrical energy from one voltage level to another level trough the performance of a single magnetic coupling and is based on the priciple of electromagnetic induction. A transformer must be equipped w...

Full description

Saved in:
Bibliographic Details
Main Authors: , YANITA AYUNINGTYAS, , Ir. Y. Wahyo Setiyono., MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/124889/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65051
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.124889
record_format dspace
spelling id-ugm-repo.1248892016-03-04T08:44:32Z https://repository.ugm.ac.id/124889/ PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA , YANITA AYUNINGTYAS , Ir. Y. Wahyo Setiyono., MT. ETD A transformer is an electrical apparatus that can move or transfer electrical energi and converts electrical energy from one voltage level to another level trough the performance of a single magnetic coupling and is based on the priciple of electromagnetic induction. A transformer must be equipped with their nameplate. According to ANSI and IEEE commissioning a transformer at the time (the handover) should be tested first technical specifications listed on their nameplate. On occassion this intern authors conducted a final project in the form of case studies on the electrical checks on the three phase transformer with 13800 volts of primary voltage, secondary voltage of 34500 volts, and has a 14.7 MVA. After the repaired transformer needs to be done due diligence, process measurements taken include insulation resistance measurement, resistance measurement, measurement of the ratio, vector group testing, short circuit testing, and testing SFRA. Measurements were taken before the repair and after repair is completed. So that the results of these measurements can determine wheter or not a transformer is to be reused as the previous function. In the process of this measurement using the standard of Electrical Apparatus Service Association (EASA). [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , YANITA AYUNINGTYAS and , Ir. Y. Wahyo Setiyono., MT. (2013) PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65051
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, YANITA AYUNINGTYAS
, Ir. Y. Wahyo Setiyono., MT.
PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA
description A transformer is an electrical apparatus that can move or transfer electrical energi and converts electrical energy from one voltage level to another level trough the performance of a single magnetic coupling and is based on the priciple of electromagnetic induction. A transformer must be equipped with their nameplate. According to ANSI and IEEE commissioning a transformer at the time (the handover) should be tested first technical specifications listed on their nameplate. On occassion this intern authors conducted a final project in the form of case studies on the electrical checks on the three phase transformer with 13800 volts of primary voltage, secondary voltage of 34500 volts, and has a 14.7 MVA. After the repaired transformer needs to be done due diligence, process measurements taken include insulation resistance measurement, resistance measurement, measurement of the ratio, vector group testing, short circuit testing, and testing SFRA. Measurements were taken before the repair and after repair is completed. So that the results of these measurements can determine wheter or not a transformer is to be reused as the previous function. In the process of this measurement using the standard of Electrical Apparatus Service Association (EASA).
format Theses and Dissertations
NonPeerReviewed
author , YANITA AYUNINGTYAS
, Ir. Y. Wahyo Setiyono., MT.
author_facet , YANITA AYUNINGTYAS
, Ir. Y. Wahyo Setiyono., MT.
author_sort , YANITA AYUNINGTYAS
title PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA
title_short PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA
title_full PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA
title_fullStr PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA
title_full_unstemmed PENGUJIAN ELEKTRIS PADA PERBAIKAN TRANSFORMATOR DAYA 3 FASA 13800 V/34500 V 14,7 MVA
title_sort pengujian elektris pada perbaikan transformator daya 3 fasa 13800 v/34500 v 14,7 mva
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/124889/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65051
_version_ 1681232162813116416