PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
Plant Departement constitutes one of the department existed at PT. Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve that belong to the corporate. In preserve process there are some task subject that shall be performed by a planner, one of it� s the filter requirement for heavy...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/125295/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65462 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.125295 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1252952016-03-04T08:37:20Z https://repository.ugm.ac.id/125295/ PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE , GATOT RANGGATAMA , Ir. Eko Wismo., M.Sc., Ph.D. ETD Plant Departement constitutes one of the department existed at PT. Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve that belong to the corporate. In preserve process there are some task subject that shall be performed by a planner, one of it� s the filter requirement for heavy equipment for a year, and plots budget which shall at issues by firm for buying filter annually. In planning system implement in one year periode a lot of filter and the others calculation that becomes and decided, as amount of heavy equipment that needs filter, the heavy equipment component parts that need filters, filter, and it�s substitution schedule on their vehicle component. Therefore the planning system is made, the aim of this calculation is to plan the filter requirement plan and filter cost for prediction the next years Count already being done correctfully and was evaluated by senior maintenance planner before eventual agreemented by center management at Jakarta. The result of filter requirement on 2013 totaled cost as big as US$ 3.110.306,23. That appreciative estimate will ever be been evaluated on each month up to year 2013. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , GATOT RANGGATAMA and , Ir. Eko Wismo., M.Sc., Ph.D. (2013) PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65462 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , GATOT RANGGATAMA , Ir. Eko Wismo., M.Sc., Ph.D. PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE |
description |
Plant Departement constitutes one of the department existed at PT.
Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve
that belong to the corporate. In preserve process there are some task subject
that shall be performed by a planner, one of it� s the filter requirement for
heavy equipment for a year, and plots budget which shall at issues by firm
for buying filter annually.
In planning system implement in one year periode a lot of filter and
the others calculation that becomes and decided, as amount of heavy
equipment that needs filter, the heavy equipment component parts that need
filters, filter, and it�s substitution schedule on their vehicle component.
Therefore the planning system is made, the aim of this calculation is to plan
the filter requirement plan and filter cost for prediction the next years
Count already being done correctfully and was evaluated by senior
maintenance planner before eventual agreemented by center management at
Jakarta. The result of filter requirement on 2013 totaled cost as big as US$
3.110.306,23. That appreciative estimate will ever be been evaluated on
each month up to year 2013. |
format |
Theses and Dissertations NonPeerReviewed |
author |
, GATOT RANGGATAMA , Ir. Eko Wismo., M.Sc., Ph.D. |
author_facet |
, GATOT RANGGATAMA , Ir. Eko Wismo., M.Sc., Ph.D. |
author_sort |
, GATOT RANGGATAMA |
title |
PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE |
title_short |
PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE |
title_full |
PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE |
title_fullStr |
PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE |
title_full_unstemmed |
PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE |
title_sort |
pembuatan program filter budgeting schedule |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2013 |
url |
https://repository.ugm.ac.id/125295/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65462 |
_version_ |
1681232235690196992 |