PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE

Plant Departement constitutes one of the department existed at PT. Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve that belong to the corporate. In preserve process there are some task subject that shall be performed by a planner, one of it� s the filter requirement for heavy...

Full description

Saved in:
Bibliographic Details
Main Authors: , GATOT RANGGATAMA, , Ir. Eko Wismo., M.Sc., Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/125295/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65462
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.125295
record_format dspace
spelling id-ugm-repo.1252952016-03-04T08:37:20Z https://repository.ugm.ac.id/125295/ PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE , GATOT RANGGATAMA , Ir. Eko Wismo., M.Sc., Ph.D. ETD Plant Departement constitutes one of the department existed at PT. Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve that belong to the corporate. In preserve process there are some task subject that shall be performed by a planner, one of it� s the filter requirement for heavy equipment for a year, and plots budget which shall at issues by firm for buying filter annually. In planning system implement in one year periode a lot of filter and the others calculation that becomes and decided, as amount of heavy equipment that needs filter, the heavy equipment component parts that need filters, filter, and it�s substitution schedule on their vehicle component. Therefore the planning system is made, the aim of this calculation is to plan the filter requirement plan and filter cost for prediction the next years Count already being done correctfully and was evaluated by senior maintenance planner before eventual agreemented by center management at Jakarta. The result of filter requirement on 2013 totaled cost as big as US$ 3.110.306,23. That appreciative estimate will ever be been evaluated on each month up to year 2013. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , GATOT RANGGATAMA and , Ir. Eko Wismo., M.Sc., Ph.D. (2013) PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65462
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, GATOT RANGGATAMA
, Ir. Eko Wismo., M.Sc., Ph.D.
PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
description Plant Departement constitutes one of the department existed at PT. Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve that belong to the corporate. In preserve process there are some task subject that shall be performed by a planner, one of it� s the filter requirement for heavy equipment for a year, and plots budget which shall at issues by firm for buying filter annually. In planning system implement in one year periode a lot of filter and the others calculation that becomes and decided, as amount of heavy equipment that needs filter, the heavy equipment component parts that need filters, filter, and it�s substitution schedule on their vehicle component. Therefore the planning system is made, the aim of this calculation is to plan the filter requirement plan and filter cost for prediction the next years Count already being done correctfully and was evaluated by senior maintenance planner before eventual agreemented by center management at Jakarta. The result of filter requirement on 2013 totaled cost as big as US$ 3.110.306,23. That appreciative estimate will ever be been evaluated on each month up to year 2013.
format Theses and Dissertations
NonPeerReviewed
author , GATOT RANGGATAMA
, Ir. Eko Wismo., M.Sc., Ph.D.
author_facet , GATOT RANGGATAMA
, Ir. Eko Wismo., M.Sc., Ph.D.
author_sort , GATOT RANGGATAMA
title PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
title_short PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
title_full PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
title_fullStr PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
title_full_unstemmed PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
title_sort pembuatan program filter budgeting schedule
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/125295/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65462
_version_ 1681232235690196992