ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
Management of change for oil and gas company�s facilities are the most important aspect the company shall pay attention to. The facilities Management of Change (MOC) is directly impact to the security and safety of the workforce. Chevron as the biggest crude oil producer in Indonesia does not give...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/125457/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65626 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.125457 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1254572016-03-04T08:39:40Z https://repository.ugm.ac.id/125457/ ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY , Kim Sion , Dr. Hardo Basuki, M.Soc., Sc. ETD Management of change for oil and gas company�s facilities are the most important aspect the company shall pay attention to. The facilities Management of Change (MOC) is directly impact to the security and safety of the workforce. Chevron as the biggest crude oil producer in Indonesia does not give any tolerance to the failure in the implementation of management of change. The failure in managing the process of management of change means increasing in the risk factor of safety. Zero accident is the target to achieve. Zero is Attainable. Most of the time, the managing of management of change only pay attention to soft factors such as Goals, Leadership, Focus, Process, Reward System and the use of Consultant (Beer, 2000). While the hard factors such as Duration of change, Integrity, Commitment and Effort are neglected. This is the reasons why two out of three transformation initiatives fail. (Sirkin, 2000), including what happened at Chevron. Analysis has been done for Chevron by deploying Porter�s Five Forces analysis, SWOT and DICE analysis. Those analyses show the competitive advantage of Chevron as well as the strength and weaknesses of the management of change process and recommendation for improvement. The weaknesses in the process of management of change can be improved based on DICE analysis and optimized as new competitive advantage for the Chevron. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , Kim Sion and , Dr. Hardo Basuki, M.Soc., Sc. (2013) ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65626 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , Kim Sion , Dr. Hardo Basuki, M.Soc., Sc. ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY |
description |
Management of change for oil and gas company�s facilities are the most
important aspect the company shall pay attention to. The facilities Management of
Change (MOC) is directly impact to the security and safety of the workforce.
Chevron as the biggest crude oil producer in Indonesia does not give any
tolerance to the failure in the implementation of management of change. The
failure in managing the process of management of change means increasing in the
risk factor of safety. Zero accident is the target to achieve. Zero is Attainable.
Most of the time, the managing of management of change only pay
attention to soft factors such as Goals, Leadership, Focus, Process, Reward
System and the use of Consultant (Beer, 2000). While the hard factors such as
Duration of change, Integrity, Commitment and Effort are neglected. This is the
reasons why two out of three transformation initiatives fail. (Sirkin, 2000),
including what happened at Chevron.
Analysis has been done for Chevron by deploying Porter�s Five Forces
analysis, SWOT and DICE analysis. Those analyses show the competitive
advantage of Chevron as well as the strength and weaknesses of the management
of change process and recommendation for improvement. The weaknesses in the
process of management of change can be improved based on DICE analysis and
optimized as new competitive advantage for the Chevron. |
format |
Theses and Dissertations NonPeerReviewed |
author |
, Kim Sion , Dr. Hardo Basuki, M.Soc., Sc. |
author_facet |
, Kim Sion , Dr. Hardo Basuki, M.Soc., Sc. |
author_sort |
, Kim Sion |
title |
ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY |
title_short |
ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY |
title_full |
ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY |
title_fullStr |
ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY |
title_full_unstemmed |
ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY |
title_sort |
analisys dice score untuk facility management of change di chevron indonesia company |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2013 |
url |
https://repository.ugm.ac.id/125457/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65626 |
_version_ |
1681232264461025280 |