ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY

Management of change for oil and gas company�s facilities are the most important aspect the company shall pay attention to. The facilities Management of Change (MOC) is directly impact to the security and safety of the workforce. Chevron as the biggest crude oil producer in Indonesia does not give...

Full description

Saved in:
Bibliographic Details
Main Authors: , Kim Sion, , Dr. Hardo Basuki, M.Soc., Sc.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/125457/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65626
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.125457
record_format dspace
spelling id-ugm-repo.1254572016-03-04T08:39:40Z https://repository.ugm.ac.id/125457/ ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY , Kim Sion , Dr. Hardo Basuki, M.Soc., Sc. ETD Management of change for oil and gas company�s facilities are the most important aspect the company shall pay attention to. The facilities Management of Change (MOC) is directly impact to the security and safety of the workforce. Chevron as the biggest crude oil producer in Indonesia does not give any tolerance to the failure in the implementation of management of change. The failure in managing the process of management of change means increasing in the risk factor of safety. Zero accident is the target to achieve. Zero is Attainable. Most of the time, the managing of management of change only pay attention to soft factors such as Goals, Leadership, Focus, Process, Reward System and the use of Consultant (Beer, 2000). While the hard factors such as Duration of change, Integrity, Commitment and Effort are neglected. This is the reasons why two out of three transformation initiatives fail. (Sirkin, 2000), including what happened at Chevron. Analysis has been done for Chevron by deploying Porter�s Five Forces analysis, SWOT and DICE analysis. Those analyses show the competitive advantage of Chevron as well as the strength and weaknesses of the management of change process and recommendation for improvement. The weaknesses in the process of management of change can be improved based on DICE analysis and optimized as new competitive advantage for the Chevron. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , Kim Sion and , Dr. Hardo Basuki, M.Soc., Sc. (2013) ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65626
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, Kim Sion
, Dr. Hardo Basuki, M.Soc., Sc.
ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
description Management of change for oil and gas company�s facilities are the most important aspect the company shall pay attention to. The facilities Management of Change (MOC) is directly impact to the security and safety of the workforce. Chevron as the biggest crude oil producer in Indonesia does not give any tolerance to the failure in the implementation of management of change. The failure in managing the process of management of change means increasing in the risk factor of safety. Zero accident is the target to achieve. Zero is Attainable. Most of the time, the managing of management of change only pay attention to soft factors such as Goals, Leadership, Focus, Process, Reward System and the use of Consultant (Beer, 2000). While the hard factors such as Duration of change, Integrity, Commitment and Effort are neglected. This is the reasons why two out of three transformation initiatives fail. (Sirkin, 2000), including what happened at Chevron. Analysis has been done for Chevron by deploying Porter�s Five Forces analysis, SWOT and DICE analysis. Those analyses show the competitive advantage of Chevron as well as the strength and weaknesses of the management of change process and recommendation for improvement. The weaknesses in the process of management of change can be improved based on DICE analysis and optimized as new competitive advantage for the Chevron.
format Theses and Dissertations
NonPeerReviewed
author , Kim Sion
, Dr. Hardo Basuki, M.Soc., Sc.
author_facet , Kim Sion
, Dr. Hardo Basuki, M.Soc., Sc.
author_sort , Kim Sion
title ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
title_short ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
title_full ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
title_fullStr ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
title_full_unstemmed ANALISYS DICE SCORE UNTUK FACILITY MANAGEMENT OF CHANGE DI CHEVRON INDONESIA COMPANY
title_sort analisys dice score untuk facility management of change di chevron indonesia company
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/125457/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65626
_version_ 1681232264461025280