KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU

Palm Oil Factory PT. Inecda Plantation is a company engaged in oil palm processing argoindustri CPO (Crude Palm Oil. Palm oil processing, there are several stages of the process that requires energy needs. Required calculations in order to determine the maximum load for capacity and determine the ef...

Full description

Saved in:
Bibliographic Details
Main Authors: , MOHAMMAD JINDAR ALFARISI, , Ir. Daroto, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/127520/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67779
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.127520
record_format dspace
spelling id-ugm-repo.1275202016-03-04T08:00:15Z https://repository.ugm.ac.id/127520/ KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU , MOHAMMAD JINDAR ALFARISI , Ir. Daroto, MT. ETD Palm Oil Factory PT. Inecda Plantation is a company engaged in oil palm processing argoindustri CPO (Crude Palm Oil. Palm oil processing, there are several stages of the process that requires energy needs. Required calculations in order to determine the maximum load for capacity and determine the efficiency of the power generated at the power plant ( Steam Power Plant) in the production process of palm oil processing PT. Inecda Plantation to the load capacity required in the production process. Observations on the activity of PT. Inecda Plantation has its own power generation system (power plant) with a capacity of 800 KW of electrical power, the output of steam after the turbine through the boiling process used for palm fruits using high-pressure steam. Research on electric power needs PT. The Plantation Inecda conducted from April 1 to April 30, 2013, with the sample for 30 days resulted in an average maximum power of 667.5 kW during the processing of palm oil production process takes place, where the size of a system tailored to the size of the plant production capacity the industry. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , MOHAMMAD JINDAR ALFARISI and , Ir. Daroto, MT. (2014) KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67779
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, MOHAMMAD JINDAR ALFARISI
, Ir. Daroto, MT.
KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU
description Palm Oil Factory PT. Inecda Plantation is a company engaged in oil palm processing argoindustri CPO (Crude Palm Oil. Palm oil processing, there are several stages of the process that requires energy needs. Required calculations in order to determine the maximum load for capacity and determine the efficiency of the power generated at the power plant ( Steam Power Plant) in the production process of palm oil processing PT. Inecda Plantation to the load capacity required in the production process. Observations on the activity of PT. Inecda Plantation has its own power generation system (power plant) with a capacity of 800 KW of electrical power, the output of steam after the turbine through the boiling process used for palm fruits using high-pressure steam. Research on electric power needs PT. The Plantation Inecda conducted from April 1 to April 30, 2013, with the sample for 30 days resulted in an average maximum power of 667.5 kW during the processing of palm oil production process takes place, where the size of a system tailored to the size of the plant production capacity the industry.
format Theses and Dissertations
NonPeerReviewed
author , MOHAMMAD JINDAR ALFARISI
, Ir. Daroto, MT.
author_facet , MOHAMMAD JINDAR ALFARISI
, Ir. Daroto, MT.
author_sort , MOHAMMAD JINDAR ALFARISI
title KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU
title_short KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU
title_full KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU
title_fullStr KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU
title_full_unstemmed KEBUTUHAN DAYA LISTRIK DI PABRIK KELAPA SAWIT PT INECDA PLANTATION SEBERIDA INDRAGIRI HULU RIAU
title_sort kebutuhan daya listrik di pabrik kelapa sawit pt inecda plantation seberida indragiri hulu riau
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/127520/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67779
_version_ 1681232630667804672